My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2002 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 3:00:07 PM
Creation date
5/8/2019 1:59:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2006
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 7 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: p Piping Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used_ X Pressure ❑Vacuum ❑Hydrostatic <br /> Cl, Other(Specify) <br /> Test Equipment Used; Air compressor and 0-15#Dial Gauge Equipment Resolution: <br /> Piping Ran <br /> 41 Piping Run# 2 Piping Run#3 Piping Run 44 <br /> Piping Material: Poly Poly Poly Poiy <br /> Piping Manufacturer: OPW OPW <br /> Environ Environ <br /> Piping Diameter. 1.5" 1.5" 1.5" 1.5" <br /> Length of Piping Run: 80' 80' 30' 30' <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location.of Unable to isolate due Unable to isolate due Test boots at the ends Test boots at the ends <br /> i in -run isolation.; to no test boots to no test boots of the piping runs of piping runs <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: i <br /> initial Reading(RO: 5 psi 5 psi <br /> Test End.Time: <br /> Final Reading(.RF); 5 psi 5 psi. <br /> Test Duration: 30 minutes 30 minutes <br /> Change in Reading(RT-Rr): No change No change <br /> Pass/Fail Threshold or <br /> 11 Criteria: No change=pass No change=pass <br /> Test Result: ❑ Pass ❑ Fail Q Pass 0 )Fail C Pass ❑ nil ❑ PM ❑ Fall <br /> Comments—(include information on repairs made prior to testing, and recommended follow up forailed tests) <br /> Pine runs 1 and 2 have no tet boots iv UDC' d nive sum <br /> -Sit e quires a total of�16� 2 0' X 2.0" Split bOOtS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.