My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
2200 - Hazardous Waste Program
>
PR0517751
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 4:28:53 PM
Creation date
5/9/2019 4:14:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0517751
PE
2227
FACILITY_ID
FA0013577
FACILITY_NAME
ITS TECHNOLOGIES & LOGISTICS
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109027
CURRENT_STATUS
01
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
01
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />Process: Wastewater Separation <br />Units: Tanks T-110, T-117 <br />Used Lubricant Return Pump P-110 <br />Wastewater Pumps P-109, P-115 <br />Wastewater Coalescer Separator 5-102 <br />Sump Pump P-114 <br />Process: Evaporation And Condensation <br />Units: Tanks E-106, T-115 <br />Feedstock Heater E-105 <br />Evaporator Pumps P-103, P-104, P-105 <br />Condensate Pump P-111 <br />Lightened Return Pump P-112 <br />Evaporator Condenser E-107 <br />Condensate Separator 5-101 <br />Process: Recycled Oil Storage <br />Units: Tanks T-105, T-106, T-107 <br />Process: Fuel Blending <br />Units: Tanks T-109, T-111 <br />Fuel Oil Pumps P-113, P-107 <br />The recycled oil in Tanks T-105, T-106, and T-107 must <br />meet the recycled oil criteria prior to being mixed <br />with the material coming from Tanks T -109 -or T-111. <br />E. Mass Balance <br />The facility shall at all times, be in compliance with <br />environmental mass balance analysis schematic chart as <br />shown in Attachment I, and as described in the following, <br />unless prior approval from the Department is obtained for <br />any changes in the facility's environmental mass balance <br />audit. <br />1. Design capacity of the recycling process shall not <br />exceed a maximum of 600 gallon/hour or a maximum total <br />of 5,250,000 gallon/year as indicated in the Operation <br />Plan and the EIR. There shall not be any changes in <br />the recycling units and/or processes unless obtaining <br />prior approval from the Department. <br />2. Heavy sediments, tank bottoms, and oily sludges <br />produced by the facility shall not exceed 1.0 percent <br />of the total processed load and shall be disposed of <br />only at an approved facility. However, after <br />May 8, 1990, those heavy sediments, tank bottoms, and <br />oily sludges must be in compliance with the <br />Department's treatment standards prior to being <br />disposed of in a Class I land disposal site. <br />3. Generated wastewater shall not exceed 5.0 percent of <br />the total processed load and shall be tested for its <br />-34- <br />
The URL can be used to link to this page
Your browser does not support the video tag.