My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT FOR MORE INFORMATION! <br />Abwtav 5555 Skylone Blvd., & , A / Santa Rosa, CA 95403 <br />3pwPh: (800) 688-3375 / Fx: (800) 700-1188 <br />"` www.westemfg.com <br />.rr rrr�r <br />q i i <br />"TC" FRICTION <br />TYPE "A" <br />TYPE "B" <br />TWIST -SEAL LID: <br />1. After sump(s) have been installed on site and <br />TWW AND SEAL all work inside has been completed, inspect <br />the gasket in the lid to make sure it is free of <br />damage or debris. Also make sure the <br />surface of the reducer where the gasket will <br />come in contact is clean and smooth. <br />Lubricate the gasket with supplied grease. <br />2. Align the arrow on the edge of the lid with the <br />arrow on the side of the reducer. <br />3. Place lid into reducer and turn in a clock -wise direction until gasket <br />is firmly seated. <br />4. FOR VACUUM TESTING: Re -test sump(s) with vacuum. Pull maximum <br />of one inch of vacuum for 15 to 30 minutes. <br />SUMP PENETRATIONS: <br />Piping and electrical conduit penetrations are made using only a <br />Listed/Approved penetration, sealing device. Use care when drilling through <br />filament wound sump riser tubes. Do not force hole saw, for FRP sumps, cut <br />hole slowly, half way through from both sides (inside and out) to prevent <br />fraying of filament strands. Always use correct size hole saw or drill. Do not <br />fiberglass bond piping or conduit directly to FRP sumps as this will not allow <br />any movement, due to ground settling, back -fill, etc. <br />ADDITIONAL INSTALLATION REQUIREMENTS - STATE OF FLORIDA ONLY: <br />Leak Test Requirement: <br />1) a. Fill entire sump within 4 to b inches of top. <br />Page 31 of 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.