My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO 2008 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 3:02:33 PM
Creation date
5/15/2019 2:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2011
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification-Page 3 of 3 <br /> Site Address: 6425 N.Pacific Ave. Date of Testing/Servicing: 6116110 <br /> F. In-Tank Gauging/SIR Equipment: a Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes 0 No* Was accuracy of system water level readings tested? <br /> ❑ Yes 13 No* Were all probes reinstalled properly? <br /> ❑ Yes O No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 0 Check this box if LLD's are not installed. <br /> Complete the following checklist: <br /> CK Yes ❑ No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak reate:R 3 g.p.h.(L); O 0.1 g.p.h. (2.); ❑ 0.2 g.p.h.(2.). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> a Yes Q No* I Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> Ix Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes l7 No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> m N/A <br /> CE Yes D No* For electronic LLD's,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> Yes O No* For electronic LLD's, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> B Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A I malfunctions or fails a test? <br /> z Yes O No* For electronic LLD's,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> Ix Yes O No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: 6116/10 <br /> Replaced Syphon Jets on 87-1,87-2&91. <br /> Replaced Check Valve on 87-2. <br /> Need to return to repair&retest 87-2&91 PLLD's. <br /> 6/21/10- Ran test on 87-2 and 91 &both PLLD's failed. <br /> Replaced syphon jet on 87-2,purged 600 gallons of fuel to get air out of line,retested &passed. <br /> Replaced preset check valve and syphon jet on 91,purged 600 gallons of fuel to get air out of line-all <br /> passed. <br /> Per conversation with Garrett on 7/15,even though No PLLD Sensor's were installed,he does need to <br /> witness them passing.Tentatively scheduled to 7/20/10. <br />
The URL can be used to link to this page
Your browser does not support the video tag.