My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 2:14:40 PM
Creation date
5/17/2019 2:01:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
568
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CaliforniVegional Water Quality Cowl Board <br /> Central Valley Region <br /> d <br /> Karl E. Longley,ScD,P.E.,Chair <br /> Arnold <br /> Linda S.Adams 11020 Sun Center Drive 92O0,Rancho Cordova,California 95670-6114 Schwarzenegger <br /> Secretaryfor Phone(916)464-3291 •FAX(916)4644645 Govemor <br /> Environmenml http://www.waterbouds.ca.gov/centralvalley <br /> Protection j-H��-,...y� �� <br /> 18 December 2008 HE <br /> 2 2008 <br /> ENVIRONMENT HEALTH <br /> Mr. Dale Gillespie PERMIT/SERVICES <br /> Geweke Land Development and Marketing <br /> PO Box 1210 <br /> Lodi, CA 95241 <br /> DOCUMENT REVIEW, CLEANUP AND ABATEMENT ORDER (CAO) NO. 93-701, <br /> GEWEK.E PROPERTY, 16 SOUTH CHEROKEE LANE, LODI, SAN JOAQUIN COUNTY <br /> I reviewed the 10 December 2008 In-Situ Chemical Oxidation Pilot Study (Workplan) <br /> submitted on your behalf by Advanced GeoEnvironmental, Inc. (AGE) for the subject site. The <br /> Workplan contains a proposal to conduct either a six (6) month, or (up to) twelve (12) month <br /> pilot test using Oxygen Release Compound Advanced® (ORC-A) as an in-situ remedial <br /> process. Five injection points around offsite monitoring well MW-9 will be used one time to <br /> inject up to 50 pounds of slurry into each boring. The Workplan also proposes sampling wells <br /> MW-8 and MW-9 for additional parameters during quarterly monitoring, to determine the <br /> effectiveness of the testing and to identify if any adverse subsurface conditions are created <br /> that may require mitigation. <br /> Please note that the Regional Board has recently adopted General Order R5-2008-0149 that <br /> regulates the type of action being proposed (ORC-A injection). Further, that said General <br /> Order also addresses bench scale testing as well as pilot testing. In that the proposed actions <br /> were in consideration well before the General Order was adopted, I am seeking advice <br /> regarding the applicability of being allowed to perform those pilot tests in the works prior to the <br /> adoption of the General Order without the issuance of said General Order. In that it may take <br /> a number of weeks before I am responded to, and in order to protect water quality and ensure <br /> that human health and safety is achieved, you are to proceed with the proposed pilot testing <br /> as soon as possible with the below noted modifications. Once I have received the information <br /> I am seeking and based upon the results of the pilot testing, a permit issued (as applicable) <br /> pursuant to the said General Order will be discussed with your environmental consultant AGE. <br /> In light of the above your proposed pilot testing is determined to be reasonable and tentatively <br /> approved with the following modifications: <br /> 1. You are to report results of the pilot study quarterly for two quarters, and to complete <br /> the pilot study in six (6) months. The final report of the results is to be submitted in the <br /> second quarter 2009 monitoring report, which is due 1 August 2009. <br /> 2. For purpose of monitoring the pilot test you are to use monitoring wells MW-8, MW-9, <br /> MW-10, MW-11, and MW-12 for all pilot study analyses, and sample said wells <br /> California Environmental Protection Agency <br /> Qd Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.