My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001640
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
ARCHIVED REPORTS XR0001640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:03:28 PM
Creation date
5/17/2019 2:15:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001640
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br />. Chronology - 2 - 17 February 1993 <br /> Geweke <br /> 12 Jun 90 B&C submitted a progress report including the sampling report <br /> of the 5 existing wells. Four of the 5 wells were <br /> contaminated. The PAR was not yet submitted. <br /> 13 Jun 90 In a letter to Geweke, the Office of Chief Counsel agreed to <br /> hold the request for rescission in abeyance for two years from <br /> the date of the petition. <br /> 29 Jun 90 The FRP was not submitted as required by the C&A. <br /> 03 Jul 90 Four new wells were installed as per the 23 March 1990 work <br /> plan. Contamination was found and ground water contamination <br /> was not yet defined. <br /> 15 Jul 90 B&C submitted a letter reporting that samples had been <br /> collected and anticipated that a report would be submitted by <br /> 13 August 1990. <br /> 24 Aug 90 A report was submitted describing the well installation and <br /> sample results. All downgradient wells were contaminated. <br />• 24 Aug 90 The FRP was not implemented as required by the C&A. The PAR <br /> had not yet been submitted either. <br /> 31 Aug 90 In a letter to Geweke, the Executive Officer expressed concern <br /> over the delays in investigation and required submittal of a <br /> new work plan and time schedule to define the contamination by <br /> 28 September 1990. <br /> 28 Sep 90 The new work plan and time schedule were not submitted. <br /> 1 Oct 90 During a telephone conversation, B&C staff reported to Board <br /> staff that the report would be submitted by the end of the <br /> week. <br /> 5 Oct 90 A time schedule and recommendations to install additional <br /> wells and an interim ground water treatment system was <br /> submitted by B&C. <br /> 2 Jan 91 Board and County staffs inspected the site. <br /> 15 Jan 91 In a letter to Geweke, Board staff accepted the work plan and <br /> directed that the treatment system design be submitted by <br /> 15 February 1991 . <br /> 31 Jan 91 County staff notified Geweke that the site had been placed in <br />. the Local Oversight Program (LOP) . <br /> 12 Feb 91 A second work plan to install additional monitoring wells was <br />
The URL can be used to link to this page
Your browser does not support the video tag.