My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001676
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
16
>
2900 - Site Mitigation Program
>
PR0522479
>
ARCHIVED REPORTS XR0001676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:05:08 PM
Creation date
5/17/2019 2:21:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001676
RECORD_ID
PR0522479
PE
2957
FACILITY_ID
FA0015299
FACILITY_NAME
GEWEKE LAND DEVELOPMENT & MARKETING
STREET_NUMBER
16
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04323013
CURRENT_STATUS
01
SITE_LOCATION
16 S CHEROKEE LN
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20 January 2003 <br /> AGE-NC Project No 95-0109 <br /> Page 3 of 8 <br /> labeled DOT-approved 55-gallon drums and was stored on-site Field sheets and data are Included <br /> in Appendix B <br /> 2 1 5 Well Head Survey <br /> On 13 January 2002, a California state-licensed survey engineer from Baumbach & Piazza, Inc <br /> surveyed a reference point on the top of ground water monitoring wells MW-15 through MW-19 to <br /> the nearest 0 01-foot relative to City of Lodi Bench Marks Number 3 at 53 28 feet above mean sea <br /> level (MSL) The results of the monitoring well survey are contained in Table 1 The surveying <br /> report (Baumbach &Piazza) is presented in Appendix C <br /> 2 2 QUARTERLY WELL MONITORING PROCEDURES <br /> According to the Revised Monitoring and Reporting Program,dated 27 June 2001,monitoring wells <br /> MW-7 through MW-9, MW-12 and MW-14 were to be sampled on a quarterly basis, all new wells <br /> must be sampled on a quarterly basis and all on- and off-site wells must be sampled on an annual <br /> basis Since new wells MW-15 through MW-19 were installed and were required to be sampled <br /> during the last week of fourth quarter 2002, AGE sampled all of the on- and off-site wells, thereby <br /> including the year 2003 annual sampling program in the fourth quarter 2002 report, AGE received <br /> verbal approval for the sampling modification in a phone conversation with CVRWQCB staff on 08 <br /> January 2002 <br /> On 23 December 2002 wells MW-1 through MW-14 and EW-1 were monitored and sampled On <br /> 27 December 2002 wells MW-15 through MW-19 were sampled upon completion of well <br /> development,development and sampling were performed on the same day in order to include sample <br /> data from wells MW-15 through MW-19 in the fourth quarter report <br /> 2 2 1 Well Monitoring and Evacuation <br /> A Solinst water level meter was used to measure the depth to ground water to the nearest 0 01-foot <br /> in all twenty wells relative to the tops of the well casings The ground water elevation in each well <br /> was calculated by subtracting the depth to ground water from the surveyed well casing elevation <br /> (Table 1) <br /> After water levels were measured,wells MW-1 through MW-14 were purged using new disposable <br /> plastic bailers, well EW-1 was purged using a Grundfos Redi-flaw submersible purge pump, and <br /> Advanced GeoEnvlronmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.