My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012581
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
3500 - Local Oversight Program
>
PR0544475
>
ARCHIVED REPORTS XR0012581
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2019 3:39:12 PM
Creation date
5/17/2019 3:21:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012581
RECORD_ID
PR0544475
PE
3528
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SHELL) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
02
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Station No. 502, 35 ti. Cherokee Cane, Lodi, - Interim Remediation Plan <br /> performed to ensure compliance with <br /> Hydrocarbon vapor concentrations at each extraction mittwellswill benrecorded <br /> to establish a baseline to gauge the prooress of remediation. <br /> Air samples from the system will be obtained in tedlar air,r� s, <br /> samples will be transported to a laboratory for Gas Chrome:° ra h <br /> Q These <br /> analysis of ben1G„e toluene, ethylbenzene and xylenes {BTE a' g The GCGis <br /> equipped with a .Flame-Ionization DetectorFID <br /> { for total hydrocarbons <br /> and aPhoto-Ionization Detector (PID) for (Fl <br /> Operation and Monitoring <br /> The catalytic unit will operate twenty-four hours per day, seven days per <br /> week. The system will <br /> be monitored and adjusted every two weeks. <br /> Monitoring will include the analysis of .hvdrocarhnns.. i„ +ha. a..�.�„�+ . <br /> -.._ stroa�..+o t«a� $ysLem I�iTI be operat;ng within permit conditions. <br /> i The individual extraction wells will be monitored to document the <br /> (k progress of remediation. <br /> In general, extraction at an individual well <br /> will be discontinued when the hydrocarbon vapor concentration has been <br /> reduced below about 100 ppm, . <br /> Operational Schedule <br /> The VES should be ready for start-up by the time the necessary regulatory <br /> approvals are obtained. The VES will operate continuously twenty-four <br /> hours per day seven days per week for a period of approximately one year. <br /> ti <br /> Process Flow.Rates <br /> The maximum achievable process rate for a YES is directly related to the <br /> flaw capacity of the vacuum <br /> concentration that can be abatpump and the maximum hydrocarbon <br /> ed by the emissions control system. For <br /> this particular syste!n, the vacuum extraction capacity of the pump unit <br /> is 190 scfm. The catalytic incinerator can abate hydrocarbons in <br /> ” concentrations as high as 3,250 <br /> - .�. 9 � . ppm (25% LEL). <br /> Based on these <br /> ani t <br /> incinerator, the capacities <br /> ewtngsmaxi�mumprocess and sion <br /> he <br /> etion fratesc�n pounds <br /> of the <br /> per day were calculela#ed:' <br /> MAXIMUM PROCESS FLOW AND EMISSION RATES <br /> Constituent influent Process Rate Effluent Emission Rate* <br /> TVH 3,250 ppm 115 lbs/day I53 <br /> ---- — - -- -- - <br /> ppm 5.8 lbs/day <br /> s day based on 100 scfm flow rate <br /> rye <br /> :... — 7 — <br /> - ”V <br /> k %: <br />
The URL can be used to link to this page
Your browser does not support the video tag.