My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
5463
>
2900 - Site Mitigation Program
>
PR0523785
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2019 5:02:08 PM
Creation date
5/28/2019 4:55:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523785
PE
2965
FACILITY_ID
FA0016022
FACILITY_NAME
CHEROKEE FREIGHT LINES
STREET_NUMBER
5463
Direction
E
STREET_NAME
CHEROKEE
STREET_TYPE
RD
City
STOCKTON
Zip
952151120
APN
08712143
CURRENT_STATUS
01
SITE_LOCATION
5463 E CHEROKEE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> April 26, 1988 AGS Job No. 2005-P <br /> Delta Truck Sales, Stockton, California <br /> ground-water surface. The remainder of the well will consist of <br /> 2-inch blank PVC casing. <br /> An appropriate sorted sand filter (0. 02- to 0. 16-inch grain size) <br /> will be placed into the annular space of the well opposite the <br /> slotted interval through the hollow stem of the auger to a point <br /> i <br /> approximately 2 feet above the slotted interval. A 1- to 2-foot <br /> thick plug of bentonite pellets will be placed at the top of the <br /> sand pack. Approximately two gallons of deionized water will be <br /> added to hydrate the bentonite pellets for at least 30 minutes. <br /> The remaining annulus will then be filled to just below surface <br /> grade with a bentonite-cement slurry. Sand, bentonite, and <br /> grouting slurry will be placed using a tremie pipe to avoid <br /> bridging the well. Schematic diagrams of the proposed well <br /> z construction are shown in Plates P-4 and P-5. This well design <br /> will be sufficient for filtering fine- to medium-grained sand <br /> from the formation using standard materials. <br /> The well head will be fitted with a locking steel cage and a cast <br /> aluminum utility box set slightly above grade. The utility box <br /> is equipped with a watertight seal. This combination will reduce <br /> the likelihood of surface water entering the well and of <br /> unauthorized disturbance. Well casings, screen, and other <br /> L15 <br /> X <br /> App/14901GeoSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.