My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF THI 7MY <br /> HUNTSVILLE DIVISION. CORPS OF c ...;INEERS <br /> P.O. BOX 1600 <br /> MA <br /> � •��;*/�/ HUNTSVILLE. ALABAMA 35807-4301 <br /> REPLY TO <br /> ATTENTION OF <br /> S: 30 March 1990 <br /> CEHND-ED-PM (200-1a) <br /> 16 March 1990 <br /> MEMORANDUM FOR Commander, Defense Depot Tracy, ATTN: DDTC-WB <br /> (Harris) , Tracy, CA 95376-5000 <br /> SUBJECT: Defense Depot Tracy, CA (DDTC) , Environmental <br /> Restoration Master Plan <br /> I. The U. S. Army Engineer Division, Huntsville (USAEDH) , acting <br /> an your behalf, is currently managing and planning eight projects <br /> which will lead to the successful environmental restoration of <br /> DDTC. These projects are being addressed and contracted for on <br /> an "as identified" basis. This results in multiple contractors <br /> performing work at DDTC, but will not detract from the final ob- <br /> jective of having DDTC ' s environmental restoration process cul- <br /> minate in an all inclusive Remedial Investigation/Feasibility <br /> Study (RI/FS) report and a final Remedial Action program. <br /> 2 . This letter addresses individual project statuses and <br /> recommends a strategy leading to the comprehensive environmental <br /> restoration at DDTC. <br /> a. RI/FS - Woodward-Clyde Consultants (WCC) . This project <br /> is currently underway and has just been modified to include addi- <br /> tional sampling and analysis to further characterize the aquifer <br /> and conclude the contract with a Final Record of Decision (ROD) <br /> by 6 May 1991 . The revised schedule is : <br /> Preliminary Draft RI/FS Report 20 Aug 90 <br /> Government Review 10 Sep 90 <br /> Draft RI/FS Report 8 Oct 90 <br /> Government and Regulatory Review 5 Nov 90 <br /> Review Meeting 12 Nov 90 <br /> Preliminary Final RI/FS and Draft ROD 28 Jan 91 <br /> Government Review 18 Feb 91 <br /> Final RI/FS Report and interim Final ROD 18 Mar 91 <br /> Government and Regulatory Review <br /> Review Meeting 8 Apr 91 <br /> Final ROD 15 Apr 91 <br /> Completion of Services 6 May 91 <br /> Overall Contract Completion Date 6 May 91 <br /> -- 3 Jun 91 <br /> DDTC . <br /> This Will conclude WCC ' s invol^eme^ t the RI/FS process at <br /> We acknowledge that aata gaps and continuing concerns <br />
The URL can be used to link to this page
Your browser does not support the video tag.