My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
25700
>
2900 - Site Mitigation Program
>
PR0508450
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 11:58:23 AM
Creation date
5/29/2019 11:10:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508450
PE
2960
FACILITY_ID
FA0008087
FACILITY_NAME
DDJC-TRACY
STREET_NUMBER
25700
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
25207002
CURRENT_STATUS
01
SITE_LOCATION
25700 CHRISMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7, m C, <br /> STATE OF CALIFORNIA—CALIFORNIA EN"RONA3FTAL PROTECTION AGENCY • PETE WILSON, Gowen <br /> DEPARTMENT OF TOXIC SUBSTANCES CONTROL - <br /> REGION 1 <br /> 10151 CROYDON WAY, SUITE 3 <br /> SACRAMENTO, CA 95827-2106 <br /> K E K O R A K D U K <br /> TO: Jim Pinasco <br /> Waste Management Engineer <br /> Site Mitigation Branch <br /> FROM: Brad Parsons <br /> Senior Hazardoumaterials Specialist <br /> Geological Support Branch <br /> DATE: July 27, 1994 <br /> SUBJECT: TECHNICAL REQUEST TO REVIEW RI/FS WORKPLAN: DDRW TRACY <br /> Activities Requested <br /> Review the Phase II RI/FS Workplan for a consistent approach <br /> with the Department of Toxic Substances Control (Department) <br /> policy and statistics. <br /> Review Activities <br /> Reviewed Appendix A, Field Sampling Plan, and Appendix B, <br /> Quality Assurance Project Plan, of the document titled <br /> Comprehensive Remedial Investigation/Feasibility Study - Phase II <br /> Work Plan prepared by Montgomery Watson and dated June 1994 . <br /> Discussion/Analysis <br /> Field Sampling Plan <br /> Page A. 2-4, Section A.2. 2.4.2: Field audits should be <br /> conducted early in any new field activity to detect critical <br /> flaws with followup audits later. Suggest that this be stated <br /> here and that the auditors be as independent as possible, yet <br /> knowledgeable and thorough. <br /> Page A.3-3, Section A.3 .3 .O. 3 : Will 30' slant drilling be <br /> enough of an angle to arrive at three feet below the sump? <br /> RP.J8 <br /> PIKASCO.LO1/fta16 <br /> A <br /> to <br />
The URL can be used to link to this page
Your browser does not support the video tag.