My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHRISTOPHER
>
18800
>
2900 - Site Mitigation Program
>
PR0523929
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 10:47:55 AM
Creation date
5/30/2019 10:22:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0523929
PE
2965
FACILITY_ID
FA0016100
FACILITY_NAME
WRP #1/ CITY OF LATHROP
STREET_NUMBER
18800
STREET_NAME
CHRISTOPHER
STREET_TYPE
WAY
City
LATHROP
Zip
95330
APN
19813035
CURRENT_STATUS
01
SITE_LOCATION
18800 CHRISTOPHER WAY
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> River Islands 6835.4.002.01 <br /> Pond E, Water Recycling Plant September 6, 2005 <br /> AUTHORIZATION REQUEST FOR MONITORING WELL Page 4 <br /> INSTALLATION AND GROUNDWATER STUDY <br /> • A boring log with soil lithologic descriptions and well construction details <br /> • A Monitoring well development and sampling data form <br /> • Groundwater elevation data <br /> • Analytical data summary tables <br /> • Discussion of field activities and groundwater conditions <br /> Subsequent quarterly monitoring reports will include cumulative data and discussion of field <br /> activities and changes in groundwater conditions. <br /> SCHEDULE <br /> We plan to complete the monitoring well installation within approximately 4 weeks of receiving <br /> formal authorization to proceed unless site construction activities require a delay. Reporting and <br /> continued quarterly monitoring efforts for the groundwater study will be performed over the next <br /> year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.