0 <br /> River Islands 6835.4.002.01 <br /> Pond E, Water Recycling Plant September 6, 2005 <br /> AUTHORIZATION REQUEST FOR MONITORING WELL Page 4 <br /> INSTALLATION AND GROUNDWATER STUDY <br /> • A boring log with soil lithologic descriptions and well construction details <br /> • A Monitoring well development and sampling data form <br /> • Groundwater elevation data <br /> • Analytical data summary tables <br /> • Discussion of field activities and groundwater conditions <br /> Subsequent quarterly monitoring reports will include cumulative data and discussion of field <br /> activities and changes in groundwater conditions. <br /> SCHEDULE <br /> We plan to complete the monitoring well installation within approximately 4 weeks of receiving <br /> formal authorization to proceed unless site construction activities require a delay. Reporting and <br /> continued quarterly monitoring efforts for the groundwater study will be performed over the next <br /> year. <br />