Laserfiche WebLink
Mike Pitta <br /> Pave 4 <br /> April 27, 2004 <br /> Schedule. CH2M HILL will use a local subcontractor,H.T. Harvey& Associates,to assist <br /> with design of the plant and irrigation system. CH2M HILL has successfully used this <br /> company on other similar projects and found their services to be cost effective. This <br /> subtask will include the following: <br /> • Kickoff meeting at the site between two CH2M HILL staff,H. T. Harvey& Associates, <br /> KMEP staff,and interested landowners to review the project and any potential design <br /> constraints. <br /> • Determining soil amendment and fertilizer requirements from the agronomic soil <br /> sampling previously performed by CH2M HILL on September 11,2003(A&L Western <br /> Agricultural Laboratories). <br /> • Preparation of a draft conceptual planting plan for review by KMEP <br /> • Preparing a revised conceptual planting plan for review by the land owners <br /> It is anticipated that a budget of 12,000 will be sufficient for 1-1. T. Harvey&Associates to <br /> complete their work for Subtasks B and C. <br /> Subtask C—Prepare Cleanup Plan. CH2M HILL will prepare the cleanup plan for <br /> submittal to the RWQCB by August 1,2004. As described above,this cleanup plan will be <br /> prepared in accordance with the following:: <br /> • Phytoremediation Work Plan(CH2M HILL,September 1S,2003) <br /> • Guidance for Items to be Inchided in a Clean tip Plan(RWQCB,April S,2004) <br /> • Results of Early Action Activities,performed above as Subtask A <br /> • Results of Conceptual Planting Plan,prepared above as Subtask B <br /> The cleanup plan will include the preparation of plans and specifications that will be <br /> provided as an appendix to the cleanup plan and also be suitable for third party bidding <br /> and construction. The plans and specifications will be prepared by CH2M HILL and <br /> H.T. Harvey&Associates. The specifications will include three sections: Earthwork(if any <br /> is needed),Planting,and Irrigation. The specifications will include information on:planting <br /> location, types and size of plant material to be used,planting methods,irrigation system <br /> components and layout,irrigation rates and schedule,plant maintenance, and noxious weed <br /> control,among other details. The implementation schedule and any contractor performance <br /> standards will also be included in the plans and specifications. Plan-view drawings will be <br /> prepared using existing base maps to show key specification elements. <br /> CH2M HILL will prepare a draft cleanup plan,including plans and specifications,for <br /> review by KMEP and a final cleanup plan incorporating any comments by KMEP for <br /> submission to the RWQCB. If necessary,CH2M HILL will revise the cleanup plan to <br /> address potential comments by the RWQCB. <br />