My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COOK
>
0
>
2900 - Site Mitigation Program
>
PR0505378
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:14:59 AM
Creation date
6/18/2019 10:39:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505378
PE
2960
FACILITY_ID
FA0006743
FACILITY_NAME
HOLT LEAK SITE
STREET_NUMBER
0
STREET_NAME
COOK
STREET_TYPE
RD
City
HOLT
Zip
95234
CURRENT_STATUS
01
SITE_LOCATION
COOK RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Pitta <br /> Page 6 <br /> April 27, 2004 <br /> • Quarterly monitoring of wells downgradient of detectable hydrocarbons(N-18,N-19)to <br /> detect potential downgradient migration. <br /> • Semiannual monitoring of all wells at the site(quarterly wells plus M-1,M-2,M-8,N-20, <br /> N-21,N-22,N-23,N-24) during the first and third quarters <br /> The monitoring wells are sampled by SECOR and the samples are analyzed by Alpha <br /> Analytical under the direction of SECOR. Quarterly and semiannual data reports <br /> summarizing the field and laboratory results are prepared by SECOR. The samples are <br /> analyzed for indicators of hydrocarbon contamination and naturally occurring <br /> biodegradation. SECOR and Alpha analytical perform this work under direct contract to <br /> KMEP. <br /> CH2M HILL will perform the following work: <br /> • Coordinate with SECOR to assure that the groundwater monitoring work is being <br /> implemented in accordance with Revised MRP No. R5-2004-0803 <br /> • Use the groundwater monitoring results to track progress of the bioremediation pilot <br /> study <br /> • Prepare the quarterly and semiannual groundwater monitoring reports for submittal to <br /> the RWQCB in accordance with Revised MRP No. R5-2004-0803 <br /> • Coordinate with KMEP and RWQCB on the progress of the bioremediation pilot study <br /> CH2M IILL will prepare the following reports as required by the MRP: <br /> • Semiannual report for 41h quarter 2003 and lst quarter 2004 <br /> • Quarterly report for 2nd quarter 2004(electronic data report) <br /> • Semiannual report for 2nd and 31d quarter 2004(also annual report) <br /> • Quarterly report for 4th quarter 2004(electronic data report) <br /> The semiannual reports will be submitted to the RWQCB as hard copies by May 1st and <br /> November 1St, respectively,and the quarterly reports will be submitted to the RWQCB as <br /> electronic data reports by February 15t and August 1St,respectively. The reports will be <br /> similar in format to the routine monitoring reports prepared by CH2M HILL for 2003. <br /> It is assumed that SECOR will continue to perform the groundwater monitoring field work <br /> under contract to KMEP and will prepare the following materials for inclusion into the <br /> reports: <br /> • Data tables for well gauging and groundwater analytical results <br /> • Figures of site location and site plan <br /> • Figures interpreting groundwater elevations and petroleum hydrocarbon concentrations <br /> • Hydrographs and chemical concentration trend changes for selected wells <br />
The URL can be used to link to this page
Your browser does not support the video tag.