Laserfiche WebLink
Two 20-pound ABC fire extinquishers will be placed in <br /> the operational areas of the exclusion zones. In addition <br /> fire extinquishers are located in personnel support truck. <br /> Contact will be maintained with the LLNL fire department to <br /> ensure that they are appraised of OHM operations. <br /> Emergency equipment which is standard equipment in the <br /> personnel support truck is as follows: <br /> 1. First aid Kits <br /> 2 . Emergency oxygen <br /> 3 . Eye wash <br /> 4. Stretcher <br /> 5. Fire blanket <br /> Telephone numbers for the security, fire, ambulance, <br /> and hospital will be strategically posted. All telephone <br /> numbers will be periodically checked for correctness. The <br /> H ambulance service will contacted and given directions on how to <br /> reach the site. <br /> �Q Project Schedule <br /> The project schedule is graphically presented in <br /> figure 4.0-1. <br /> The schedule indicates that the total project duration <br /> is four working days. This estimate is based on anticipated <br /> analytical requirements for the waste materials. <br /> Mobilization and site preparation are expected to take <br /> a total of one working day. Following site preparation packaging <br /> of reagent containers into drums will commence. Sorting and <br /> packaging operations are estimated to take 1 day. Transportation <br /> to the consolidation area will begin early the following morning <br /> and should be complete by midmorning. Crushing operations will <br /> be completed by the end of the same day. <br /> OHN <br />