My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
0
>
2900 - Site Mitigation Program
>
PR0009019
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 1:46:14 PM
Creation date
6/18/2019 1:33:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009019
PE
2954
FACILITY_ID
FA0004085
FACILITY_NAME
LLNL-SITE 300
STREET_NUMBER
0
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Two 20-pound ABC fire extinquishers will be placed in <br /> the operational areas of the exclusion zones. In addition <br /> fire extinquishers are located in personnel support truck. <br /> Contact will be maintained with the LLNL fire department to <br /> ensure that they are appraised of OHM operations. <br /> Emergency equipment which is standard equipment in the <br /> personnel support truck is as follows: <br /> 1. First aid Kits <br /> 2 . Emergency oxygen <br /> 3 . Eye wash <br /> 4. Stretcher <br /> 5. Fire blanket <br /> Telephone numbers for the security, fire, ambulance, <br /> and hospital will be strategically posted. All telephone <br /> numbers will be periodically checked for correctness. The <br /> H ambulance service will contacted and given directions on how to <br /> reach the site. <br /> �Q Project Schedule <br /> The project schedule is graphically presented in <br /> figure 4.0-1. <br /> The schedule indicates that the total project duration <br /> is four working days. This estimate is based on anticipated <br /> analytical requirements for the waste materials. <br /> Mobilization and site preparation are expected to take <br /> a total of one working day. Following site preparation packaging <br /> of reagent containers into drums will commence. Sorting and <br /> packaging operations are estimated to take 1 day. Transportation <br /> to the consolidation area will begin early the following morning <br /> and should be complete by midmorning. Crushing operations will <br /> be completed by the end of the same day. <br /> OHN <br />
The URL can be used to link to this page
Your browser does not support the video tag.