My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
0
>
2900 - Site Mitigation Program
>
PR0009019
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 1:46:14 PM
Creation date
6/18/2019 1:33:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009019
PE
2954
FACILITY_ID
FA0004085
FACILITY_NAME
LLNL-SITE 300
STREET_NUMBER
0
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Management <br /> This section presents OHM's approach to integrating all <br /> project activities in order to ensure the safe, timely, and <br /> efficient completion of the LLNL project. The management <br /> approach is discussed and the resources to be utilized in <br /> the various tasks are described. <br /> 5. 1 Management Approach <br /> OHM believes that careful project management is the key <br /> factor in assuring that work elements are successfully <br /> completed within prescribed time limits while maintaining <br /> strict standards of product quality. The specific <br /> management approach to each work element will be tailored to <br /> it's magnitude and complexity, thereby allowing project <br /> personnel to focus their particular skills and expertise <br /> through the Project Manager. <br /> OHM has developed a system for project management based <br /> on successful completion of numerous projects. Coordination <br /> of the total work effort is effected through a management <br /> approach characterized by: <br /> 1. Administrative control <br /> 2 . Technical control <br /> 3. Financial control <br /> 55. 2 Pro ect Management Organization <br /> The Project Director will provide executive-level liaison <br /> between OHM and the LLNL OSC while day-to-day workings of the <br /> project team are coordinated by the Project Manager and OSC. <br /> Three specific functional areas of project execution are <br /> identified: <br /> Analytical-chemistry support <br /> Site restoration support <br /> Disposal <br /> Each of these key personnel leads a team providing <br /> specific skills needed to fully address the work effort. <br /> Safety, health, and quality control are integral parts <br /> of all OHM's projects. These functions are usually <br /> coordinated by someone not involved in the day-to-day <br /> project activities to promote objectivity and the <br /> responsible personnel report directly to the Project <br /> Director. All project personnel are also intimately <br /> 9 involved in safety and quality control on a daily basis. <br /> OHN <br />
The URL can be used to link to this page
Your browser does not support the video tag.