Project Coordination and Communication <br /> The following actions will be taken to ensure that the <br /> team effort will result in a timely, cost-effective, <br /> top-quality program. <br /> 1. OHM's Project Director, Project Manager, and other <br /> key personnel will meet with the LLNL OSC to review <br /> project scope, objectives, and methodology. <br /> 2 . Communication links between LLNL's and OHM's <br /> personnel will be established. <br /> 3 . LLNL's staff, together with the Project Manager <br /> will modify the plans presented by OHM as <br /> appropriate. <br /> 4. Field equipment will be assembled. <br /> 4 The project team will meet to review plans in detail <br /> and clarify assignments. Throughout this period and for the <br /> project duration, the Project Manager will maintain close <br /> contact with the OSC to assure proper coordination of all <br /> efforts. <br /> As the program proceeds, there will be periodic formal <br /> review meetings to ensure a timely review of all data and <br /> provide an opportunity for mid-course corrections to the <br /> program based either on the needs of the OSC or the <br /> recommendations of OHM. However, no such changes will be <br /> made without the mutual agreement between the OSC and OHM's <br /> staff and written authorization. Progress reports will be <br /> issued by OHM on a periodic basis. <br /> Between formal review meetings, it is anticipated that <br /> close contact between OHM's team and the OSC will assure <br /> that LLNL's personnel are aware of potential problems, and <br /> that concerns are addressed expeditiously. OHM's Project <br /> Manager is responsible for maintaining proper documentation <br /> of the project including substantive telephone <br /> communications and decision-related agreements between the <br /> OSC and OHM. <br /> 1 <br /> 5.4 Subcontractor Management <br /> OHM is experienced in subcontract management and <br /> possesses the system and procedures for effective <br /> subcontractor management. Transportation and Disposal <br /> coordination will be performed on an as needed basis. This <br /> coordination will based upon the types and quantities of the <br /> wastes generated. <br /> OHM <br />