My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
0
>
2900 - Site Mitigation Program
>
PR0009019
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 1:46:14 PM
Creation date
6/18/2019 1:33:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009019
PE
2954
FACILITY_ID
FA0004085
FACILITY_NAME
LLNL-SITE 300
STREET_NUMBER
0
STREET_NAME
CORRAL HOLLOW
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
CORRAL HOLLOW RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Coordination and Communication <br /> The following actions will be taken to ensure that the <br /> team effort will result in a timely, cost-effective, <br /> top-quality program. <br /> 1. OHM's Project Director, Project Manager, and other <br /> key personnel will meet with the LLNL OSC to review <br /> project scope, objectives, and methodology. <br /> 2 . Communication links between LLNL's and OHM's <br /> personnel will be established. <br /> 3 . LLNL's staff, together with the Project Manager <br /> will modify the plans presented by OHM as <br /> appropriate. <br /> 4. Field equipment will be assembled. <br /> 4 The project team will meet to review plans in detail <br /> and clarify assignments. Throughout this period and for the <br /> project duration, the Project Manager will maintain close <br /> contact with the OSC to assure proper coordination of all <br /> efforts. <br /> As the program proceeds, there will be periodic formal <br /> review meetings to ensure a timely review of all data and <br /> provide an opportunity for mid-course corrections to the <br /> program based either on the needs of the OSC or the <br /> recommendations of OHM. However, no such changes will be <br /> made without the mutual agreement between the OSC and OHM's <br /> staff and written authorization. Progress reports will be <br /> issued by OHM on a periodic basis. <br /> Between formal review meetings, it is anticipated that <br /> close contact between OHM's team and the OSC will assure <br /> that LLNL's personnel are aware of potential problems, and <br /> that concerns are addressed expeditiously. OHM's Project <br /> Manager is responsible for maintaining proper documentation <br /> of the project including substantive telephone <br /> communications and decision-related agreements between the <br /> OSC and OHM. <br /> 1 <br /> 5.4 Subcontractor Management <br /> OHM is experienced in subcontract management and <br /> possesses the system and procedures for effective <br /> subcontractor management. Transportation and Disposal <br /> coordination will be performed on an as needed basis. This <br /> coordination will based upon the types and quantities of the <br /> wastes generated. <br /> OHM <br />