My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
API 653 inspector Signature: Inspector shall verify that th b Rep he signed Date: <br /> rift he above item then Inspector can signoff. �[ <br /> In. • •• The completed final weld shall be visa Vrnspecled(VT f a SP representative. <br /> /. <br /> Date: <br /> Job Representative Signature:Job Rep shall ua y inspe'ra er work Is <br /> completed. Job Rep shall sign oil each it.API ., 71 <br /> .If <br /> above <br /> Signature: Inspector I .¢ that the Jo R¢p has at ned D �7�1� <br /> off tho aUave item[hen Inspector can sjgnoff. CsY// <br /> C. TVT . • The completed wgltis shall be Magnetic Particle examined( by NDE contractor,both <br /> interior and exterior,and witnessed bye BP represenlall <br /> Job Representative Signature:Job Rep shall visually act-f�w rk is Date: <br /> completed. Job Rep shall sign off each day if acce a e. // <br /> // L/ 71d <br /> API 653 Inspector Signature: Inspector shall part m r quired NDE If ceptable Date: <br /> then Il can be sign off. / <br /> i <br /> 'L The flange shall be aligned and plumb with boll holes straddle the centerline.The Oa welds shall be full <br /> and core late fillet welds utilizing E7018 electrodes. <br /> a. . • •• The welds shall be visually inspected ^by a BP representative. <br /> Date: <br /> Job Representative Signature:Job Rep shall v' u y iry eel ( r work ft sign <br /> completed. Joh Rep shall oft each d/ay/' ac ro� <br /> / <br /> API 653 Inspector Signature.Inspector sh I veri that lh ob Rep has igned Date: <br /> off the above item then Inspector can <br /> 9. A new 2'gate valve shall be installed on the 2 15011 flange nozzle with new g el and lubricated studC/ <br /> bods/nuts. <br /> 10. • • •• The completed meta lation shall be via. <br /> Inspected(VT)by a BP representative <br /> Date: <br /> Job Representative Signature:Job Rep a vis p y I act alter werk is// <br /> completed. Job Rap shall sign oties d it G p e L� <br /> API 653 Inspector Signature:inspa or sh I verify that the Job Rep has signed Date: <br /> off the have item than Inspector an ci off , <br /> �,r�Y 6,/7/irk <br />
The URL can be used to link to this page
Your browser does not support the video tag.