Laserfiche WebLink
, 1 Ufa <br /> rw•V ', all l" <br /> zv� <br /> c <br /> muN � <br /> $hull <br /> aMbm-- <br /> Shell Nozzle and Appurtehence Table <br /> slz CL C1rc RaPad Raped Rontl Reload Nack full tell• Wel <br /> Nom [Newipdon a Elev IXa[ (fl) Width Halphl Thiek shop Thick Thick TMe Space Commenle <br /> _pn In)_ In In In in In M n <br /> 3 Threaded <br /> ITDischarge 2 6 - - - - - Coupling <br /> The dila represented in the weld deal come Is the mlimum speoing measured,H,V w N indieanni w ee io mtnlmum deleoce <br /> measuned loom the nate. (H=Hor¢ental Weld,V=vin ical Welds N=Mail Wel) <br /> cW-Comr,md. AR=Repad of Ilam A. A=Wel of Item A, HW=Horzo l Weld VW=Verocal Weld, Ts=TomSbhMa Type Rapid <br /> /'\ 0 CED <br /> 'r added ahhoteeni (D] <br /> Shell Coupling Replacement with 2" Nozzle <br /> (ITEM 71 CODE 5) <br /> 1. There is one)1)existing 1-114'threaded Shell Coupling"P•'which shall be removed and replaced with a 2' <br /> ganged nozzle.The installation shall comply with API-653 and API-650 weld spacing requirements.The <br /> installation shall comply with API-650 Figure 5.6. <br /> 2. The 2'Flanged nozzle connection to the tank shall be installed In accordance with API-650 Figure 5-9.The <br /> nozzle neck shall be welded on both inside and outside of the tank shell. <br /> 3. Paint shall be removed from the area where cut out is to be made <br /> 4. The tank shell cut out shall match that of the nozzle size with proper allowance for weld tit-up In accordance <br /> with the a proved welding procedure The nozzle shall be tacked in place. <br /> 5. a e -0 The hill of the nozzle shall be visually impacted(VT)by a BP representative for compliance <br /> with the approved welding procedure. <br /> Data: <br /> Job Representative Sigri lure:dub Rep shall vi.--KII nsp-'l after work Is <br /> completed. Job Rep shall sign off each day If a�cj.Tatably:. i <br /> O / <br /> l � F <br />