Laserfiche WebLink
PAGE: 23 of 63 <br /> AP1653 inspector Signature:Inspector shall verify that Oe Job Re has signed Date: ,"l <br /> off the above Item than Inspector can sigrtoft �. /����( //(l <br /> B. All nozzle-to-shell welding shall be full fillet welded complete fusion and c plata pane ration utilizing E7016 <br /> electrodes.The nozzle shall be welded both internally and externally.The let size shall be as shown in the <br /> attached drawing. Nate that the internal weld shag be flush with the internal shot)to prevent damage <br /> to floating roof seals. <br /> 7. Nozzle.toShell Weld Testing and Inspection. <br /> a, Ja r -a The completed initial weld shall be visually spatted(VT)by a BP representative. <br /> Date: <br /> Job Representative Signature:Job Rep sh/yt <br /> �er ork is <br /> completed Job Rep shall sign off each da <br /> API 653 Inspector Signature:Inspector shob Rap h 6 signed pate' <br /> off the above item then Inspector can r./ <br /> b. • - r •• The completed final weld shall be visually inspected( y a SP representative. <br /> Date: <br /> Job Representative Signature:Job Rep sh11ce <br /> es ler work is <br /> completed Jab Rep shall sign off each da <br /> v 6107 ' <br /> API 653 Inspector Signature:Inspector shae ob Rep has signed j Date: <br /> off the above dem then Inspector can sign � �� <br /> c. • • '• The completed welds,both inlernaLpn ezlernal,shall be agnebc Particle examined <br /> (MT)by NDE contractor and witnessed by a B)r resentative. <br /> Job Representative Signature:Job Rep shally4i all nspect after work is Date: <br /> completed Job Rep shall sign off oath day if cc a / <br /> API 653 Inspector Signature: Inspector all• rform re ed NDE if acceptable Data: <br /> then it can be sign off <br /> 6 Following the nozzle installation,a 2`-150M ANSI R a new 2' flanged 1 owell shall be installed on the <br /> nozzle with a new gasket and lubricated bolts and nuts <br /> _ <br /> g. • • -• The completed installation shall be visually inspected(VT)by a SP representative. <br /> Dale: <br /> Job Representative Signature:Jab Rep shalt visua6YspeCt after work is <br /> completed Jab Rep shall sign off each dayifag2.p1 J�, <br /> API 653 Inspector Signature:inspector shalt+rlf that aJobRep has signed Date: <br /> oft the above item then inspector can signo%( <br /> 1_jr9i➢tr}N }Z3`4f•)li',_C� t7a;tr'/ <br />