Laserfiche WebLink
b MM xlmq <br /> � _ter_• <br /> 1 <br /> err <br /> wwvrvo <br /> Shell Nozzle Telltale Holes <br /> ([TEM 51 CODE 4( <br /> 1 All of the existing Shell Nozzles have reinforcing plates that are missing telltale holes.Telltale holes shell be <br /> drilled and tapped. <br /> 2 A 1/4'telltale hole shall be drilled and lapped in each raped. For a split raped, one 1l4'telltale hole shall be <br /> drilled and tapped in each half repad. Near the end of the drilling operation a flat end reaming bit shall be <br /> used to avoid drilling into the tank shall.The depth of the hole shall be closely monitored to prevent damage <br /> to the shell. <br /> 3. • r •. The depth of drilled hole shall be monitored It,a BP representative. <br /> Date: <br /> A <br /> Job Representative Signature:Job Rap shall vi all inf5 et It r work is <br /> completed. Job Rep shall sign off each day ac to 1/ <br /> API 653 Inspector Signature: Inspector sh�I v dy t / t the Job p has signed Dale. <br /> off the above Ilam than Inspector can si.rJno <br /> 4. • r •• Raped welds shall be pressure tested to 15psig d all Cis,both Internal and external, <br /> soaped by the repair contractor and witnessed by a BP repres ativ <br /> Job Rapresentative Signature:Job Rep shall visuall pact oPer work is Data: <br /> completed Job Rep shall sign oR each day if ac� le j j j <br /> `/ % <br /> API 653 Inspector Signature: Inspector s711, <br /> p rfor squired NDE if acceptable Date: <br /> then It can be sign off <br /> a. If leaks are detected,the weld defect shal be weld repaired uti11 E7018 electmdes <br /> b. Com leted weld repairs shall ground,wre brush and cleaned to Inspection, <br /> C. • r -r The completed repair shall be visually inspected(VT)by a BP representative. <br /> Date: <br /> Job Representative Signature:Job Rep shall visually Inspect after wo�rk/ir/p� <br /> completed. Jab Rep shall sign off each day if acceptable / /gaA-,J <br />