My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
— t 0 Ck J S n 2.e4 e <br /> API 653 inspector Signature: Inspeder shall verify at Job ep h s signed Date: <br /> off the above item then Inspector can signeff`. <br /> it. • • •• The completed repair shell be Magnetic Particle examin (MT)by NDE conkaclor antl <br /> witnessed by a BP representative. <br /> Job Representative Signature:Job Rep shall vis y I act zfter work fs Date: <br /> completed, Job Rep shall sign ofs0 day if c p <br /> �0 a ` t'7e�e Ie <br /> • <br /> PiPltll Inspectar Signa : Inspeeler sha ped r r quiredN 1acceptable Date: <br /> then It can be sign o((. �� //7 <br /> G fX <br /> S. The telltale holes shall net be plugged after the pressure test. <br /> 6. Dow Corn in fit Silicone compaundsholl be placed into the telltale holes after testing is wmplated. <br /> 7. • • •• All areas shall be visually inspected(VT)Py a BP representative. <br /> Date: <br /> Job Representative Signature:Job Rep she 1 all p ct after work Is <br /> completed. Job Rep shall sign off each d Icc�b <br /> API 653 Inspector Signature:Inspecto shat any,that the Job Rep has signed Date: <br /> off the above item then Inspector ea signo f- <br /> 6 • • •• Tre BP Representative shall complete the "Air rest Roped Report". <br /> Date: <br /> Job Representative Signature:Job.Rr/p sh f si n if after helshehas <br /> completed / " j�� w <br /> rturste <br /> xou <br /> 1" xoTplus <br /> ttur <br /> xa.eue - nutux ,l e." <br /> eor%.11G oo noLL vFio sF1 <br /> � soxm ewe <br /> New Thermal Relief Assembly <br /> (ITEM 101 CODE 3) <br /> 1 One(1)new 2 Shell Nozzle(Thermal Rellef)shag be installed near the existing Inlet nozzle A 2 Schedule <br /> 80-150#R.F Long Weld Neck Flange nozzle shall be installed in the tank shed adjacent to the product <br /> nozzle.The installation shall comply with API-650 Figure 5-6 weld spacing requirements. A 2soekoiet shall <br /> be installed on product line on the"pipeline'side of the tank valve <br /> 2. The pressure relief valve shall be Crosby 961102MA or Consolidated 1990C. l'-MNPT x 1"-FNPT Set <br /> pressures shall be site specific and determined by the SP representative <br />
The URL can be used to link to this page
Your browser does not support the video tag.