My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/// Date: Jl <br /> Job Representative Signature:Job Rep she ICs_noff fter haishe has completed /711 <br /> verification. <br /> 8 The s of�ed ePrimer shall be applied as required following surface preparation. <br /> • • '• co <br /> g. The BP representative shall confirm application of Primer as specified. <br /> Date: <br /> Jab Representative Signature:Jab Rep sh Isr inspect after work is /// <br /> completed. Job Rep shall sign off each ' f j ,/,.v/C) <br /> AN 663 Inspector Signature:tnspec r s all verify that the Job Rep has signed De: <br /> /at <br /> off the above Item then Inspector cans nofr <br /> 10 The Detail Coat shall be applied as required fallowing the application of the Primer. <br /> 11 • • • r The BP representative shall confirm application of the Detall Coat as specified. <br /> Date: <br /> Job Representative Signature:Job Rep she ual act after work is / <br /> completed Job Rep shall sign off each d ac <br /> AN 653 Inspector Signature: Inspec r shal verify that the Job Rep has signed Date: <br /> off the above item then Inspector c Job/_ <br /> 12. The Medium Film Lining(First Coat)shall be ayd ed as required folowing the application of the Detail Coal <br /> 13. a • �• The BP representative shall a6 rm a ice to of the Medium Film Lining(First Cast)as <br /> specified. <br /> /�� � Oale <br /> Job Representative Signature:Jab ep s II visually inspect after work Is G� <br /> completed. Job Rap shall sign each ay If acceptable <br /> l <br /> API 653 Inspector Signature:Inspector shall verify that the Job Rep has signed Date: <br /> off the above item then Inspector can signoff. <br /> 14 All of the specified Inspection shall be performed and documented following the application of the Medium <br /> Film Lining(First Coat) <br /> a. Visual inspection <br /> b. Film thickness measurement. <br /> c Hardness Testing <br /> d. Holida Detection. <br /> 15 •t• •• The SP representative Sh/df <br /> al at Ms lion of the Medium Film Lining(First Coat) <br /> was performed as specified and documevimp Date'Job Representative Signature:Job ually inspect after work isl/ •7 Id <br /> ompleted. Job Rep shall sign ff. ceptable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.