My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11833 rM Oul �t ' r1tiaCn�:; r7.-..-13 i1 <br /> API 663 Inspector Signature:Inspector shall verify that the Job Rep has signed Dale: <br /> off the above Item then Inspector can signoff. <br /> 16. PT • '• The BP representative sha/IIvi <br /> ceptable dealing with chalk for repair. <br /> Date; <br /> Job Representative Signature:Job Rlly inspect after work is /��ucompleted. Job Rep shall sign off eaptable, cr <br /> AN 663 Inspector Signature:Inspector shall verify that the Job Rep has signed Dale: <br /> off the above it..then Inspector can signoff. <br /> 17. The coaling shall be repaired as the result of defects,unacceptable visual inspection of dry film thickness <br /> measurement Repairs shall be performed in accordppnee h the specifications Any repairs shall he <br /> erformed,cured,inspected and tested In accordgrf wl bov nd verified as indicated. <br /> 16, • • '• The BP representative shall cant�/ Ih a mg was repaired and Inspected as specified. <br /> �� Date: <br /> n <br /> Job Representative Signature:Job Re all Isually inspect after work is � <br /> completed Job Rep shall sign off eac da if acceptable. <br /> API 663 Inspector Signature:Inspector shall verify that the Job Rep has signea Data: <br /> off the above Item then Inspector can signoff <br /> 19 The Second Coal shall be applied as required followl Ihp Icllcl at n of the First Coal, <br /> 20 • •l • t�The BP represeri aliwe shall conf' p o e Second Coal as specified. <br /> Date/ <br /> Job Representative Signature:Job Rep all - wally inspect after work is % fv <br /> completed Job Rep shall sign oft etc da acceplabte. <br /> API 653 Inspector Signature:Inspector shall .crffy that the Job Rep has signed Date: <br /> off the above Item then Inspector can signoff. <br /> 21. All of the specified Inspection shall be performed and documented following the application of the Second <br /> Coat. <br /> a Visual Inspection <br /> b. Film thickness measurement <br /> C. Hardness Testing <br /> d. Halide Detect on. <br /> 22. • r '• The BP representative shall w-R1 all�r a of the Second Coat was performed as <br /> specified and documentation is provided �`/ <br /> Date; <br /> j <br /> Job Representative Signature:Job Reps 11 vi ally Inspect after work <br /> ,.ampleted Job Rep shall sign off each ayif cceptable. Y <br /> illi lk '_'Sl elf! i.rli :�l} ;1 1y �T = It - Yr 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.