My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2700
>
2800 - Aboveground Petroleum Storage Program
>
PR0527774
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 9:07:24 AM
Creation date
6/21/2019 1:16:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0527774
PE
2834
FACILITY_ID
FA0007644
FACILITY_NAME
BET STOCKTON TERMINAL
STREET_NUMBER
2700
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2700 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
API 653 inspector Signature: Inspector shall verify that the Job Rep has signed Date: <br /> off the above item then Inspector can signoff. <br /> 23. • r • • 1'de BP representative shall mark a acceptable coaling with chalk for repair. <br /> // Date: <br /> Job Representative Signature:Job Rep al isually inspect after work 's <br /> Completed Job Rep shall sign off etic d if acceptable. <br /> API 653 Inspector Signature:Inspector shall verify that the Job Rep has signed Date: <br /> off the above item then Inspector can signoff. <br /> 24. The coaling shall be repaired as the result of defects,,.unacceptable visual inspection or dry film thickness <br /> measurement Repairs shall be pedormnd in an:o nnr till thn slmcifirations Any repairs shall be <br /> rfomin d,cured,inspected antl tested in accold ce eb and verified as indicated. <br /> 25. • • • The BP representative shall w �It I ling was repaired and inspected as specified <br /> 6U Date <br /> Job Representative Signature:Job ps I Visually inspect aftervori, '•, l ,�(� <br /> completed. Job Rep shall sign off ach by if acceptable. <br /> API 653 Inspector Signature: Inspector shall verify that the Job Rep has signed Data: <br /> off the above item than inspector can signoff. <br /> _. • • • • Verification of the Final Acceptance,0 coa)i�:y BP representative <br /> / � <br /> Date: <br /> Job Representative Signature:Job Rep shall Isuatl nspect after work is <br /> completed Job Rep shell sign off each be , I ncc table. &` 7�C' <br /> r <br /> AN 653 Inspector Signature: Inspector shall verify that the Jab Rep has signed Date: <br /> P 'hs above^tem then Inspector can signoff. <br /> Exterior Painting <br /> I There is significant coating failure over 30 percent on the lank external surface with several areas where the <br /> paint has peeled off and there is active surface corrosion. The mating has chipped off mostly around the <br /> manway antl nozzles, no piling was noted to these areas during this inspection The first course of the tang <br /> shell and nozzles shad be blasted-Gleaned and recoaled The remainder of the lank shall be spot receated <br /> as required. (ITEM 1 I CODES)(ITEM 2 f CODE 41(CHANGE—Rev.1) <br /> 2. Thera,s sudaee corrosion an the manway and reinforcing pati where the waling has failed but no pitting. <br /> These areas shall be cleaned and remaled (ITEM 61 CODE 3) <br /> 3 The shell nozzle(suction)Is n fair condition with no significant internal corrosion,but there is surfaw <br /> corrosion around the external nozzle where the mating has peeled air These areas shat'be deaned and <br /> recoaled (ITEM 8 1 CODE 5) <br /> 4 The coaling on the fixed root Is in poor condition with several areas where the coaling has chipped off and <br /> exposed the bare metal These areas shall be cleaned and recoaled. (ITEM 131 CODE 4) <br /> (ITEM 201 CODE 5) <br /> 5, All exterior areas where the repairs were made and the coaling has failed shall be removed and recoaled <br /> I - -Ifii3l�Er ".1Z 71�f Yr'a lit X7:4 --1 r..�—, ` J!ia 0 f <br />
The URL can be used to link to this page
Your browser does not support the video tag.