Laserfiche WebLink
711 Materials, Inc. <br /> ALTA <br /> Spill Prevention, Control and Countermeasure Plan ENVIRONMENTAL <br /> Facility Response: <br /> The loading/unloading connections of facility piping are securely capped or blank- <br /> flanged when not in service or standby service for an extended time (i.e., six <br /> months or longer). <br /> (5) Provide facility lighting commensurate with the type and location of the facility that <br /> will assist in the: (i) Discovery of discharges occurring during hours of darkness, <br /> both by operating personnel, if present, and by non-operating personnel (the <br /> general public, local police, etc.); and, (ii) Prevention of discharges occurring <br /> through acts of vandalism. <br /> Facility Response: <br /> The interior and exterior of the building and grounds are well lit. Diesel and all other <br /> oil loading and unloading operations occur only during daylight hours, in well-lit <br /> areas, and/or within secondary containment. <br /> Alta Environmental 21 <br /> BASR-19-8895 <br /> July 3, 2019 <br />