My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
2900 - Site Mitigation Program
>
PR0518132
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 8:09:04 PM
Creation date
7/10/2019 11:40:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0518132
PE
2960
FACILITY_ID
FA0013716
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
01
SITE_LOCATION
15135 EIGHT MILE RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
29 September 2003 <br /> AGE-NC Project No. 01-0865 <br /> Page 6 of 10 <br /> • CPT Borings 3 - 4 days <br /> • Well Installation and Abandonment 1 week <br /> • Analytical Data 1 - 2 weeks (following each segment) <br /> • Report Preparation: 4- 6 weeks (after receipt of all data) <br /> 5.0. FIELD PROCEDURES <br /> All field procedures will be overseen by an AGE representative under the supervision of a California <br /> Registered Geologist. Procedures for the advancement of CPT borings, well abandonment, <br /> monitoring well pilot borings, soil sampling,monitoring well completion, ground water sampling, <br /> sample shipment and equipment decontamination are outlined below. <br /> 5.1. CPT ADVANCEMENT <br /> Each CPT soil boring will be advanced to a depth of approximately 100 feet bsg(120 feet bsg for <br /> the CPT on the levee)utilizing a 25-ton truck-mounted CPT drill rig equipped with 2-inch diameter <br /> hollow-stem rods.At each CPT location,the first soil boring will utilize a hydraulic ram to advance <br /> a piezocone to the desired depth. Soil parameters such as cone bearing,sleeve friction,friction ratio <br /> and pore water pressure will be measured as the piezocone is advanced. The data will be utilized to <br /> obtain a computer-generated interpretation ofthe penetrated soil lithology.Rinseate generated during <br /> drilling activities will be containerized in properly labeled DOT-approved 55-gallon drums, and <br /> stored on-site in an area lacking public access.Disposal alternatives will be evaluated at a later date <br /> based on laboratory results of rinseate. <br /> 5.2. CPT GROUND WATER SAMPLING <br /> A second, or paired, soil boring will be located adjacent to the first CPT boring for ground water <br /> sample collection.Based on CPT findings, discrete grabground water samples will be collected in <br /> significant intervals of porous and permeable strata.A HydroPunch sample tool will be pushed into <br /> the specified zone,then withdrawn approximately three feet to expose an inlet screen. The interior <br /> of the sampling tool fills with water and a 1-inch outer diameter(O.D.) stainless steel bailer will be <br /> lowered and utilized to extract a ground water sample. Grab ground water samples will be collected <br /> in selected intervals of porous and permeable material.All rinseate generated during drilling will be <br /> containerized in properly labeled DOT-approved 55-gallon drums, and stored on-site in an area <br /> lacking public access. <br /> Advanced CcoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.