My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
15135
>
3500 - Local Oversight Program
>
PR0544644
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 11:53:58 PM
Creation date
7/10/2019 4:42:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544644
PE
3529
FACILITY_ID
FA0005287
FACILITY_NAME
H & H MARINA
STREET_NUMBER
15135
Direction
W
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
STOCKTON
Zip
95219
APN
06908021
CURRENT_STATUS
02
SITE_LOCATION
15135 W EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' Report-Soil and Groundwater Investigation <br /> Hemmn&Helen's Marina <br /> September 26, 1995 <br /> ' Page-2 <br /> - <br /> on site during the UST removal to collect soil samples. The field activities were observed by Carol <br /> ' Oz of the SJCEHD. A small hole was found on the lower exterior of TK3 (diesel tank). Petroleum <br /> staining and odors were noted in the soil beneath the former locations of the USTs. Groundwater was <br /> ' not encountered during the UST removal. Six (6) soil samples were collected by Condor from the UST <br /> excavation at depths of 9 to 12 feet below the ground surface (bgs). The samples were analyzed for <br /> ' TPH-G (gasoline), BTEX, TEPH (diesel), EDB (ethylene dibromide), and total lead. Laboratory <br /> analyses indicated elevated concentrations of TPH-G, TEPH, and BTEX constituents in the soil <br /> ' samples. For additional information, refer to Tank Pull Testing Results, prepared by Condor, dated <br /> November 18, 1991. <br /> 3.0 FIELDWORK <br /> ' This section includes a description of the site preparation, hydropunch drilling, sampling, and <br /> laboratory analysis. <br /> t3.1 Site Preparation <br /> Prior to the fieldwork, authorization was obtained from Reclamation District#2029 for the <br /> ' drilling to be conducted on the levee. Drilling permits were obtained from the SJCEHD. The work <br /> area was marked with white paint and Underground Service Alert (USA) was notified at least 72 hours in <br /> ' advance of the fieldwork to locate and identify underground utilities in and near the work area. The <br /> SJCEHD, and the Reclamation District were notified of the fieldwork schedule at least 48 hours in <br /> tadvance. <br /> ' 3.2 Drilling Procedures <br /> The hydropunch boreholes (HP-1, HP-2, and HP-3) were drilled by B&F Drilling of Rancho <br /> ' Cordova, California (C57 license #519428). James Wack of Condor was on site to supervise the <br /> drilling, soil sampling, and groundwater sampling. Ronald Rowe of the SJCEHD was on site periodically <br /> to observe the fieldwork. Gilbert Cosio of Murray, Bums, and Kienlen Engineering was on site to <br /> observe the drilling activities as a Reclamation District representative. The hydropunch drilling <br /> ' locations are shown on Figure 2, Appendix A, Site Map. Prior to commencement of fieldwork, a <br /> tailgate safety meeting was held and a site-specific Health and Safety Plan was discussed with, and <br /> ' presented to, all crew members for their signatures. <br /> n <br /> ' « CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.