My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
2900 - Site Mitigation Program
>
PR0507909
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:58:21 AM
Creation date
7/11/2019 9:35:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507909
PE
2950
FACILITY_ID
FA0007832
FACILITY_NAME
WEBER BLOCK AREA 9
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> • Type of sample (soil, sediment, wood, or water) <br /> • Type of sampling equipment used <br /> • Field instrument readings , <br /> • Field observations and details related to analysis or integrity of samples (e.g., <br /> weather conditions, noticeable odors, colors, etc.) <br /> • Preliminary sample descriptions (e.g., for soils: clay loam, very wet; for water: <br /> clear water with strong ammonia-like odor) <br /> • Sample preservation <br /> • Lot numbers of the sample containers, sample identification numbers and <br /> explanatory code, chain-of-custody form numbers, and custody seal numbers <br /> • Shipping arrangements <br /> • Name(s) of recipient laboratory(ies) <br /> In addition to the sampling information, the following specific information will also be recorded <br /> in the field logbook or lognotes,for each day -of sampling: <br /> • Team members and their responsibilities <br /> • Time of site arrival/entry on site and time of site departure- <br /> • Other personnel on site <br /> • Summary of meetings or discussions with any PRFs, PRF representatives, or representatives <br /> of federal, state, or local regulatory agencies <br /> • Deviations from sampling plans, site safety plans, and QA procedures <br /> • Changes in personnel and responsibilities with.reasons for the changes <br /> • Levels of safety protection ! 1•E <br /> a • Calibration readings for any equipment used and equipment model and serial number <br /> • Site sketch showing sample,location and measured distances <br /> 8.2 Bottles and Preservatives <br /> E <br /> The number of sample containers, volumes, and materials are listed in Section 4.0. The <br /> containers are pre-cleaned and will not be rinsed prior to: sample collection. Containers with <br /> preservatives (i.e., HCl and HNO3 for VOCs and metals analysis for groundwater samples) will <br /> be requested from the laboratory,; by B&V and provided prior to the sampling event. <br /> 8.2.9 Soil Samples <br /> All soil samples will be collected in stainless steel sleeves and chilled to 4°C immediately upon <br /> collection. All soil samples will be analyzed for volatile organic compounds, semivolatile <br /> organic compounds, pesticides, metals, and TPH for gasoline. <br /> ,r <br /> 8.2.2 Sediment Samples <br /> w <br /> CLPAS Semivolatile Organic Compounds. Sediment samples will be homogenized and <br /> transferred from the sample-dedicated homogenization pail'.into 8-ounce, wide-mouth glass jars. <br /> nA36210198SAPlwebsap2.wp5 WEBER BLOCK (Area 9) Sampling and Analysis Pian 0 <br /> Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.