My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
141
>
2900 - Site Mitigation Program
>
PR0507909
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:58:21 AM
Creation date
7/11/2019 9:35:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507909
PE
2950
FACILITY_ID
FA0007832
FACILITY_NAME
WEBER BLOCK AREA 9
STREET_NUMBER
141
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
13909002
CURRENT_STATUS
02
SITE_LOCATION
141 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
View images
View plain text
%-.� 1%� <br /> 1.2 Project Organization <br /> Black & Veatch (B&V) and BASELINE Environmental will conduct this field sampling effort <br /> as part of an investigation for the Stockton Redevelopment Agency. The investigation is part of <br /> the Brownfields Redevelopment grant funded by EPA Region IX. <br /> Name/Company Title Telephone Number <br /> Wes Kulm, Stockton Project Coordinator (209) 937-8539 <br /> Redevelopment Agency <br /> Alana Lee, B&V Project Engineer (510) 246-8015 <br /> David Bolin, B&V Quality Assurance Officer (714) 788-4244 <br /> Bill Scott, BASELINE Field Geologist (510) 420-8686 <br /> _____Jl <br /> Wes Kulm, the Project Coordinator, is the Stockton Redevelopment Agency's representative for <br /> directing the environmental work at the Weber Block site. The Project Coordinator is also <br /> responsible for correspondence with EPA, 'DTSC, other regulatory agencies, and consultant <br /> (B&V) oversight and direction. The Project Coordinator has the authority, with Stockton <br /> Redevelopment Agency approval, to change the scope of activities performed by the Project <br /> Team. In addition, the Project Coordinator is responsible for approving for disposal of hazardous <br /> and non-hazardous wastes generated during the project, signing manifests, and approving any <br /> changes to the scope and budget of the project. <br /> Alana Lee, Project Engineer, is responsible for overall project execution and quality including <br /> scoping, scheduling, technical review, and client communication. The Project Engineer is also <br /> responsible for the project team's technical effort including planning, supervision of sampling <br /> events, evaluation of data, and preparation of reports. <br /> David Bolin, Quality Assurance Officer, will review, monitor, audit, and evaluate performance <br /> of work for adherence to project procedures. The Quality Assurance Officer is responsible for <br /> identifying problems that may arise in the quality of work and recommend corrective actions. <br /> Bill Scott, Field Geologist, is responsible for the quality of the geological work, and planning and <br /> executing all environmental sampling and analysis. <br /> n:136210198SAPlwebsap2.wp5 WEBER BLOCK (Area 9) Sampling and Analysis Plan <br /> Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).