My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0007671
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
400
>
3500 - Local Oversight Program
>
PR0544653
>
ARCHIVED REPORTS XR0007671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 7:45:39 PM
Creation date
7/11/2019 2:48:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007671
RECORD_ID
PR0544653
PE
3528
FACILITY_ID
FA0004695
FACILITY_NAME
BRIDGESTONE/FIRESTONE #3573
STREET_NUMBER
400
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95201
APN
13907009
CURRENT_STATUS
02
SITE_LOCATION
400 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XIT Vapor Extraction Unit (Attachment B) <br /> for Firestone Store, Stockton, CA page 3 of 5 <br /> of independently controlled electrical coils, pull a <br /> total of approximately 45 amps at 120 Volt, single phase, <br /> and are located at the perimeter and center of the <br /> oxidizer. During a twenty hour start up period, these <br /> coils reach their operating temperature. If, during <br /> normal operation, the VOC concentration in the process <br /> I stream 18 sufficient, the oxidation of the VOCs will <br /> generate enough thermal energy to periodically maintain <br /> an acceptable operating temperature. At this condition, <br /> current flow to the coils ceases. Temperature within the <br /> bed is constantly monitored in two different locations to <br /> assure adequate operating temperatures. The VES will <br /> enter the shutdown mode should the oxidizer drop below <br /> normal operating temperatures. <br /> 2. 4 Air Compressor <br /> The air compressor supplies compressed air at <br /> approximately 6. 3 cfm at 100 psi. The function of the <br /> I air compressor is to actuate the automatic dilution <br /> valve, and the four valves which control flow direction. <br /> 2. 5 Valving IHV-1, PV-11 <br /> The manual dilution valve (HV-1 ) is a twelve position <br /> butterfly valve which allows an operator to adjust the <br /> VOC concentration and/or flow from the extraction wells <br /> during start-up and periodic maintenance. <br /> The automatic dilution valve (PV-1 ) me a 6" butterfly <br /> valve. This valve will purge the VES as a result of high <br /> LEL concentration, and during changes in the direction of <br /> flow. <br /> IAs an option, the automatic dilution valve (PV-1 ) can be <br /> a modulating butterfly valve which is mechanically <br /> I actuated (optional) . This valve will regulate the VOC <br /> concentration in the process stream. <br /> 2. 6 Enclosure <br /> The electrical enclosure is rated NEMA 4 and houses most <br /> of the electrical components. <br /> 3. 0 MAJOR INSTRUMENTATION <br /> 3. 1 LEL Monitor (AT-1 ) <br /> Ryan-Murphy Incorporated <br /> "The Good Earth Company" <br />
The URL can be used to link to this page
Your browser does not support the video tag.