My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ESCALON BELLOTA
>
4469
>
2800 - Aboveground Petroleum Storage Program
>
PR0540158
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 6:33:22 PM
Creation date
7/11/2019 3:53:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0540158
PE
2832
FACILITY_ID
FA0019881
FACILITY_NAME
FARMINGTON CIRCLE K
STREET_NUMBER
4469
Direction
S
STREET_NAME
ESCALON BELLOTA
STREET_TYPE
RD
City
FARMINGTON
Zip
95230
APN
18713010
CURRENT_STATUS
01
SITE_LOCATION
4469 S ESCALON BELLOTA RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ONSHORE NONPRODUCTION FACILITIES <br /> 40 CFR 112.8(a) <br /> The Circle K in Farmington shall operate in compliance with the requirements of Section 1 12.7, as <br /> outlined in this SPCC Plan,and the specific discharge prevention and containment procedures listed in <br /> Section 112.8 asset forth below. <br /> FACILITY DRAINAGE <br /> 40 CFR 112.8(6)(3)&(4) <br /> Any discharge outside of the contained areas would be handled as discussed in 40 CFR <br /> 1 12.7(a)(3)(iv)&(v), where as in all cases-if the spill/discharge may threaten a storm drain on site or <br /> threaten to leave the property, employees will attempt to place sorbents in the spill path or around drains <br /> to block the spill-if it can he done safely. <br /> Any discharge that makes its way to the site storm system is diverted to the retention pond on-site. <br /> BULK STORAGE CONTAINERS <br /> 40 CFR 112.80(1)(2) <br /> The containers at the facility are compatible with materials stored and conditions of storage such as <br /> pressure and temperature. <br /> The secondary containment area is addressed within this Plan at 40 CFR I I2.7(a)(3)(iii). <br /> PERIODICALLY TEST THE INTEGRITY OF ABOVEGROUND TANKS <br /> 40 CI`R 112.8(c)(6) <br /> This is addressed within this Plan at 40 CFR 112.7(e). <br /> Periodical testing will be done using SP001 standards. <br /> Per industry standards, for the tanks on-site, informal inspections by on-site knowledgeable personnel on <br /> a monthly and annual basis is sufficient. (See Attachment 5 for monthly and annual inspection check <br /> lists) <br /> Formal inspections by a certified inspector should be scheduled every twenty years, unless monthly or <br /> annual inspections reveal deteriorating conditions. <br /> TANK-LEVEL ALARMS <br /> 40 CFR 112.8(c)(8) <br /> The bulk fuel tanks are equipped with level gauges (clock gauges and/or pop-up float level gauge). <br /> The bulk Fuel tanks are also equipped with high liquid level alarms with an audible or visual signal at a <br /> constantly attended operation statioti. <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.