Laserfiche WebLink
r <br /> Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility Page 7 of 45 <br /> 1.6.3 Certification of Technical Amendments to Plan [40 CFR§112.5(c)] <br /> A Professional Engineer (P.E.) must certify all technical amendments to the SPCC Plan in <br /> accordance with Section 40 CFR§112.5(c). <br /> Appendix C presents a historical log of SPCC Plan amendments for the Tesla Treatment Facility. <br /> 1.7 Qualified Facilities [40 CFR§112.61 <br /> Section 40 CFR§112.6 of the SPCC Rule is not applicable to the Tesla Treatment Facility. <br />