My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
V
>
VERNALIS
>
9000
>
2800 - Aboveground Petroleum Storage Program
>
PR0541548
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2019 9:28:07 PM
Creation date
7/11/2019 4:19:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0541548
PE
2832
FACILITY_ID
FA0009758
FACILITY_NAME
SFPUC Tesla Treatment Facility
STREET_NUMBER
9000
Direction
W
STREET_NAME
VERNALIS
STREET_TYPE
Rd
City
Tracy
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
9000 W Vernalis Rd
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spill Prevention, Control and Countermeasure Plan <br /> Tesla Treatment Facility Page 27 of 45 <br /> 2.8 Secondary Containment Non-Practicability [40 CFR§112.7(d)] <br /> Facility management has determined that secondary containment at the facilities subject to the <br /> SPCC Rule is practicable. <br /> 2.9 Inspections, Testing and Records [40 CFR§112.7(e)] <br /> Pursuant to 40 CFR§112.7(e) of the SPCC Rule, inspection and testing of the storage tanks and <br /> containers, piping, valves, sensors and related equipment are conducted by trained facility <br /> operators and specialty vendors to ensure tank and equipment integrity, and to detect any leaks or <br /> spills, or any cracks or other distress that could cause a discharge. Written procedures have been <br /> developed for conducting the inspections and testing. Records of inspections and tests are kept <br /> with the SPCC Plan in the Operations Building for a period of three (3) years. <br /> 2.9.1 Inspection and Testing Schedule <br /> Table 2-5 below summarizes the inspections and testing performed at the facility. <br /> Table 2-5: Inspection and Testing Program <br /> Facility Inspection/Testing Tasks Frequency <br /> Component <br /> Emergency Power Generation Facility <br /> Aboveground tanks. Test container integrity.Visual inspection of container Following a regular schedule <br /> exterior for signs of leakage,deterioration,and distress. (monthly,annual inspections)and <br /> whenever material repairs are made. <br /> Tank and equipment Visually inspect container's supports and foundations. Following a regular schedule <br /> support and foundation. (monthly,annual inspections)and <br /> whenever material repairs are made. <br /> Liquid level sensing Inspect and test for proper operation by a qualified Annually. <br /> devices(SimplexTM). technician as per the manufacturer's requirements. <br /> Leak Detection Sensors Inspect and test for proper operation by a qualified Annually. <br /> (Veeder Root). technician as per the manufacturer's requirements. <br /> Lowermost drain and all Visually inspect. Prior to filling and departure. <br /> outlets of tanker truck. <br /> All aboveground valves, Assess general condition of items,such as flange joints, Monthly. <br /> piping,and appurtenance. expansion joints,valve glands and bodies,catch pans, <br /> pipeline supports,locking of valves,and metal surfaces. <br /> Underground piping. Inspect for deterioration,integrity and leak testing. Whenever a section of underground <br /> piping is exposed for any reason. At <br /> the time of installation,and <br /> whenever material repairs are made. <br /> Generator engines. Visual inspection for possible leaking oil and distress Whenever power generator is <br /> during engine operation. operating,and whenever material <br /> repairs are made. <br /> Interior of Simplex and Assess general condition of items,such as flange joints, Monthly and after use. <br /> other control consoles. valve glands and bodies,catch pans,pipeline supports, <br /> locking of valves,and metal surfaces. <br />
The URL can be used to link to this page
Your browser does not support the video tag.