Laserfiche WebLink
Guide Earthwork Specifications <br /> Page 4 <br /> PLACING AND COMPACTING OF FILL MATERIAL <br /> Engineered Fill shall be placed in layers which when compacted shall not exceed six inches (6") in <br /> thickness. Each layer shall be spread evenly and shall be thoroughly mixed during spreading to promote <br /> uniformity of the material in each layer. When the moisture content of the Engineered Fill is below <br /> optimum,water shall be added until a uniform optimum moisture content is achieved. When the moisture <br /> content of the Engineered Fill is too high to permit the specked compaction, the fill shall be aerated by <br /> blading or other methods until a satisfactory moisture content is achieved. <br /> Engineered Fill shall be compacted by mechanical means to produce a minimum degree of compaction <br /> of ninety percent (90%). Building pad fills placed at depth of more than three feet (3') below final <br /> building pad level should be compacted to at least ninety-five percent (95%). Compaction shall be <br /> undertaken with equipment capable of achieving the specified density. Each layer shall be compacted <br /> over its entire area until the desired densityhas been obtained. <br /> Field density tests shall be made by the Soil Engineer in accordance with ASTM Test Designations <br /> D2922-96 and D3017-96 (Nuclear Probe Method). Where compaction equipment has disturbed the <br /> surface to a depth of several inches, density tests shall be taken in the compacted material below the <br /> disturbed surface. Additional layers of the fill shall not be spread until the field density tests indicate the <br /> specified densities haw been obtained. <br /> FINAL SUBGRADE PREPARATION <br /> The upper eight inches of all final building pad and pavement subgrades shall be compacted to a <br /> minimum degree of compaction of ninety percent(90%),regardless of whether final subgrade elevation <br /> is attained by filling, excavation, or is left at existing grade. <br /> I <br /> TESTING <br /> Observation and testing by the Soil Engineer shall be provided during all filling, compacting and <br /> treatment operations. The grading contractor shall give at least twenty-four(24) hours notice prior to <br /> beginning such operations to allow proper scheduling of the work <br /> I'. <br /> II <br /> i <br /> I <br /> i <br /> 1 <br />