Laserfiche WebLink
ENVIRONMENTAL HEA + TIEPARTME <br /> NT <br /> SAN JOAQUIN COUNTY <br /> r.ffi G Donna K.Heran Unit.Supervisors <br /> .< Director 304 East Weber Avenue;j Third Floor Carl Borgman,R.E.H.S. <br /> •;;Q Al Olsen,RE.H.S. Stockton, California 95202-2708 Mike Huggins,R.E.H.S.,R.D.I.Douglas W.Wilson,R.E.H.S. <br /> Program Manager Telephone: 209 4f 8-3420 <br /> a <br /> Foss Laurie A.Cotnlla,R.E.H.S. h ) i Margaret Lagorio,R.E.H.S. <br /> Fax: (209) 464-0138 Robert McClellon,R.E.H.S. <br /> Program Manager Mark Barcellos,R.E.H.S. <br /> ANDREW WOODS <br /> BULK TRANSPORTATION <br /> 3032 SOUTH ADO STREET <br /> STOCKTON CA 95206 <br /> RE: BULK TRANSPORTATION SITE CODE: 1468 <br /> i032-S EL DvRnD0 oA _� ... <br /> STOCKTON CA 95206 <br /> WORKPLAN: Revised Work Plan Additional Excavation and Confirmation Soil Sampling <br /> DATED: April 17,2003 <br /> PREPARED.BY: Hygienetics Environmental Services Inc. <br /> APPROVED with Conditions (see Below) <br /> ADEQUATE AND NECESSARY ELEMENTS OF THE WORKPLAN (H&S <br /> 25299.37,subd.(c)(3).): <br /> Workplan proposed excavating a volume 20 feet long by 7 feet(2 feet maximum beyond either <br /> - side of the 3-foot-widertrench).by.15-feet-deep-along the length of the former pipeline trench for <br /> maxirriucn of approximately 75 yards: .One-soil sample will be'collected form each 10-foot <br /> length of the two walls (total 4 samples) and 2 samples from the bottom of the excavation for <br /> analyses. <br />` CONDITIONS: <br /> 1) Locations of the soil samples to be collected must be'witnessed and agreed with by San <br /> Joaquin County Environmental Health Division (EHD) inspectors. <br /> 2) The work plan proposed collecting soil samples for characterization of the stockpile in <br /> _�_;"P11!-.l. . __..g -- p p r <br /> accordance to the requrements of the'ariticipated disposal-facility:. t�naiyticai results of" �'"the stockpile characterization samples must be submitted to EHD. <br /> 3) Schedule implementation of the proposed work with EHD at least 48 hours in advance. <br /> 4 Implement the proposed work no later than June 30`2003. <br /> ). � p p P J , <br /> DATED- Ma 30 2003 BY <br /> Cc. "^CRW •CB!..Central.Valle Region - aures L. Barton. <br /> k k C <br /> Cc ` Hygtenetics;Environmental,=Rodger-Witham �_r:,� f r <br /> Vit-fir.""-.Y Gc <br /> " 2 {. <br /> a C- .iiir ,3 ti <br /> .r.,-�.,z�.�` ,y�fi�r,...� l .�..�. •. , �'•� Tom'?.iSe:fir! <br /> :7r:..•4°j� <br /> a rrr <br /> -•iC- e.af. ,r.,..,�_�'..S-.1wk Y .r$ k{r �� — t• k z .. <br /> s <. i,,'.ea -AL E ..'.i.� ,�.t�� :J"l,.•,,i3 <br /> ^, t. lF f Ji1T,'�.7'...r, rr.. ..kyr <br />