My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2900 - Site Mitigation Program
>
PR0542208
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2025 9:47:59 AM
Creation date
7/24/2019 4:30:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0542208
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0024243
FACILITY_NAME
CALIFORNIA TANK LINES
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
3105 S EL DORADO ST STOCKTON 95206
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health and Safety Plan <br /> E� California Tank Lines Facility <br />� Sierra-Pacific Project No. 96-620.01 <br /> t, <br /> i <br /> • Permit visitors at work sites only at the direction of and with the permission of <br /> the client representative. Visitors shall abide by the requirements specified in this <br /> H&SP and, when possible, shall be restricted from areas of potential exposure to <br /> hazardous substances. <br /> • Establish an area in the support zone upwind of the work zone for personnel to <br /> assemble in the event of an excavation of the work zone. <br /> • Monitor operations for the existence of hazardous conditions. Monitor personnel <br /> for signs of exposure, heat stress, fatigue, etc. <br /> • Evaluate the results of the monitoring program and determine impacts on future <br /> operations. <br /> • Ensure that environmental and personnel monitoring operations are ongoing and <br /> in accordance with technical specifications, procedures, and project instructions. <br /> • Monitor site conditions during operations to determine whether any changes in <br /> work zones or personnel protection are required. <br /> • Ensure that proper personal protective equipment (PPE) is available and worn <br /> by workers. Ensure that PPE and other equipment is maintained and properly <br /> stored. <br /> • Ensure that work areas are kept clean in order to reduce the potential for general <br /> safety hazards. <br /> • Know emergency procedures and contacts. <br /> • Conduct work site safety briefings including: contents of this H&SP, safe work <br /> practices, PPE use, and emergency procedures. <br /> 4.3 All On-Site Personnel <br /> All personnel assigned to this project are responsible for following this H&SP, for using safe <br /> work practices, and for wearing the PPE specified by the SSO. Project personnel shall report <br /> hazards and unsafe conditions and practices to the SSO . All federal, State, local, and client <br /> Sierra-Pacific Groundwater Consultants, Inc. 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.