My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3147
>
3500 - Local Oversight Program
>
PR0544705
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2019 10:46:31 AM
Creation date
7/29/2019 10:40:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544705
PE
3526
FACILITY_ID
FA0003754
FACILITY_NAME
CALIFORNIA FUELS
STREET_NUMBER
3147
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512003
CURRENT_STATUS
02
SITE_LOCATION
3147 S EL DORADO ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 August 2011 <br /> AGE-NC Project No . 97-0301 <br /> Page 3 of 11 <br /> 2 .4 . GROUND WATER SAMPLE COLLECTION AND ANALYSIS <br /> All proposed extraction wells, including newly-installed wells, will initially be monitored and <br /> sampled prior to remedial operations. The proposed monitoring event will provide baseline <br /> concentration values , which will be used to gauge the overall performance of DPE <br /> operations . Procedures for ground water sample collection are presented in Section 3 .2 .4, <br /> 2 . 5 . INSTALLATION OF REMEDIATION SYSTEM PIPING NETWORK <br /> Dual phase extraction remediation system piping will be installed underground in a 24-inch <br /> wide by a 18-inch deep trench and utilizing a series of 1 - inch diameter, schedule 40 PVC <br /> piping . Additionally, as secondary containment, all 1 -inch diameter DPE remediation piping <br /> will be installed inside 2-inch diameter, schedule 40 PVC piping . The proposed trenching <br /> lay-out is depicted in Figure 3 ; a cross sectional view of the ground water extraction piping <br /> is depicted in Figure 6 . <br /> 2 .6 . REMEDIATION SYSTEM FENCING <br /> Installation of a 15-foot wide by 25-foot long , chain-link, gated enclosure will be located in <br /> southern section of the site to incorporate the DPE remediation system . The proposed <br /> remediation system fencing enclosure is illustrated in Figure 3 . <br /> 2 .7 , PROPOSED DUAL PHASE EXTRACTION REMEDIATION SYSTEM <br /> The proposed DPE system will consist of a 20-horsepower, oil filled liquid-ring blower with <br /> a electric fired catalytic oxidizer used to simultaneously extract ground water and soil-vapor <br /> from the two proposed DPE wells , VW- 1 through VW-3 and MW-7 (Figure 3 ). The <br /> liquid-ring blower under standard temperature and pressure is capable of producing a <br /> maximum vacuum of 28-inches mercury (Hg ) with a nominal capacity of 300 cubicfeet per <br /> minute(CFM)-System information is providedin AppeMix B,Hydrocarbonimpacted <br /> ground water will be treated by processing the extracted water through a series of liquid <br /> phase activated carbon vessels . Treated ground water will be discharged in the sanitary <br /> sewer system . <br /> 2 .8 . REMEDIATION MONITORING AND MAINTENANCE <br /> During the dual-phase extraction start-up period (first week of operation ) , influent and <br /> effluent-vapor samples and DPE water samples will be collected on a daily basis and <br /> submitted for laboratory analysis of petroleum constituents (i . e . TPH-g , BTEX, MTBE , %A, rrt <br /> Advanced GeoEnvironmental, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.