1 <br /> Pilot Testing Report and Conceptual Corrective Action Plan July 15, 1994 <br /> Manna Pro, 4004 South EI Dorado, Stockton, CA <br /> TABLES <br /> COMBINED GROUNDWATER PUMPING AND HVE TEST <br />' VENT-ROI MODEL RESULTS <br /> Parameter Madel Results <br />' Extraction Point Spacing (Hexagonal Array) 28 ft <br /> Flow Rate (Single Well) 15 SCFM <br />' Applied Vacuum Required 148 5 in Hz0 <br /> Radius of Influence (Single Weil) 18 ft <br />' Screen Interval 35 ft to 45 ft <br /> Borehole Diameter 625 in <br /> Clean-up Time 3 yrs <br /> Removal Goal 90% <br />' 2819RO34 070 <br /> GROUNDWATER <br />' TECHNOLOGY, INC <br />