IReport-Pilot Remedial System Test Page 13 <br /> Former Manna Pro Site <br /> Project No 207 3 <br /> July 31,2000 <br />' into the well At the compressor, a pressure regulator was used to control pressure in the <br /> air line to the limiting orifice rotameter Three phase power was supplied from an <br />' electrical service in a nearby maintenance shed <br /> 4.2 Pilot System Operation <br /> The following time line summarizes the sequence of significant event during the period <br /> the pilot system was in operation <br /> May 20 Day 0 Install ICE& Blower <br /> May 22 Day l Start Vapor Extraction System @ 1134 <br />' May 23 Day 2 ICE System Down - Restart- Start Air Sparge System @ 1456 <br /> May 24 Day 3 Monitor System -Compressor failed @ 1600 Approx <br /> May 25 Day 4 ICE System Down -Get new compressor <br /> May 30 Day 5 Restart SV E and Air Sparge w/New Compressor <br />' May 31 Day 6 Monitor System <br /> June 1 Day 7 Found ICE Down- Restarted - Ran 3 Hrs-Shut Down <br /> 4.2.1 Soil Vapor Extraction System Start Up & Operation <br /> 10 The vapor extraction system was started at 1134 on the first day (May 22) of the pilot test <br /> Shortly after the system start-up, an air sample was collected in Tedlar bags from both the <br /> influent and effluent sides of the treatment system to satisfy the Air Pollution Control <br /> District requirements The pilot system was monitored through the day and left to run <br /> over night Late in the afternoon of the third day, the system was shut down due to an air <br /> sparge compressor failure (see below) It was restarted on May 30, and allowed to run for <br /> two more days In total the soil vapor extraction operated for about 84 hours over 5 5 <br />' days <br /> 4.2.2 Air Sparge System Start Up & Operation <br />' It was planned that on the morning of the second day, the air sparge s stem would be <br />' started It was discovered, however, that the air blower intended for the fob was not <br /> adequate as described above Subsequently, a 1 5 horsepower air compressor equipped <br /> with a surge tank was installed The air sparge system was started during the early <br />' afternoon of the second day During the air sparge operations, the approximate air <br /> injection rate and pressure was monitored <br /> During the afternoon of the second day of sparging, the air compressor failed Due to the <br /> fact that it became necessary to obtain another compressor, and a long, holiday weekend <br /> was approaching, the decision was made to shut the pilot system down on May 25 and <br /> restart it on May 30 The sparge system was restarted with a new compressor at 9 30 AM <br /> 2937 Veneman Ave , #13240 Geo-Phase Environmental Inc Phone(209) 569-0293 <br /> Modesto, CA 95356 Fax(209) 569-0295 <br />