My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2900 - Site Mitigation Program
>
PR0540858
>
SITE INFORMATION AND CORRESPONDENCE FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 10:24:19 AM
Creation date
8/1/2019 10:15:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0540858
PE
2960
FACILITY_ID
FA0023360
FACILITY_NAME
ARCO SERVICE STATION #2130
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> Stantec <br /> Quarterly Status Summary Report - Second Quarter 2010 <br /> ARCO Service Station No. 2130 <br /> August 16, 2010 <br /> Characterization Status <br /> Petroleum hydrocarbon impact in the soil and groundwater has not been adequately delineated <br /> by the existing well network and previous and existing site assessment activities. <br /> Waste Disposal Summary <br /> There was no waste generated during 2Q10. <br /> Recent Correspondence <br /> Stantec received an email correspondence from San Joaquin County Environmental Health <br /> Department (SJCEHD) dated May 26 , 2010, requesting a submittal of a correspondence that <br /> was to include a remedial path forward for the site. <br /> This Quarter's Activities (Second — 2010) <br /> 1 . Stantec submitted the Semiannual Groundwater Monitoring and Remediation <br /> Progress Report First Quarter 2010 on May 11 , 2010, <br /> Next Quarters Activities (Third — 2010) <br /> 1 . Stantec will prepare and submit the QSSR - 2Q10. <br /> 2. Stantec will perform the semiannual groundwater monitoring and sampling event. <br /> 3 . In response to email correspondence from the SJCEHD dated May 26, 2010, <br /> Stantec submitted Remedial System Removal on July 9, 2010 and will implement <br /> the scope of work discussed in the correspondence. <br /> 2130 QSSR 2Q10.doc 3 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.