Laserfiche WebLink
I - <br /> Stantec <br /> quarterly Status Summary Report - Second Quarter 2090 <br /> ARCO Service Station No, 2130 <br /> August 16, 2010 <br /> Limitations <br /> This report was prepared in accordance with the scope of work outlined in Stantec's contract <br /> and with generally accepted professional engineering and environmental consulting practices <br /> existing at the time this report was prepared and applicable to the location of the site. It was <br /> prepared for the exclusive use of ARC, a BP Affiliated Company, for the express purpose <br /> stated above. Any re-use of this report for a different purpose or by others not identified above <br /> shall be at the user's sole risk without liability to Stantec, To the extent that this report is based <br /> on information provided to Stantec by third parties, Stantec may have made efforts to verify this <br /> third party information , but Stantec cannot guarantee the completeness or accuracy of this <br /> information. The opinions expressed and data collected are based on the conditions of the site <br /> existing at the time of the field investigation . No other warranties, expressed or implied are <br /> made by Stantec. <br /> Prepared by: <br /> J� CAC <br /> Kimber Collins <br /> Project Scientist <br /> - i <br /> Information , conclusions, and recommendations provided by Stantec in this document regarding <br /> the site have been prepared under the supervision of and reviewed by the licensed professional <br /> whose signature appears below. <br /> Licensed Ap_pro er: AAl. <br /> L071Z e <br /> Brad Shelton , P . G , , AN o, S, 2e Da <br /> Associate Geologist ®�t 6 <br /> 5�1y <br /> August 16, 2010 <br /> cc: Mr. James Barton , California Regional Water Quality Control Board - Central Valley Region <br /> Mr. Sergio Morescalchi , ARC, a BP Affiliated Company (Upload to Enfos) <br /> Upload to Geotracker <br /> i <br /> i <br /> i <br /> i <br /> 2130 QSSR 2Q10. doc 4 <br /> i <br /> i <br /> l <br /> l ` <br />