My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2017 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 11:51:06 AM
Creation date
8/5/2019 9:15:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />I- SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: 0 -15 PSI GAUGES Equipment Resolution: 0.002" <br />I, <br />Piping Run 4 Vapor <br />Return <br />Piping Run # <br />Piping Run 4 <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />A.O.Smith <br />Piping Diameter: <br />4" over 3" <br />Length of Piping Run: <br />Approx. 110' <br />Product Stored: <br />Vapor Recovery <br />Method and location of <br />piping -run isolation: <br />Termination Fittings <br />@ Fill Sump <br />Wait time between applying <br />pressure/vacuum/water and <br />test: <br />10 min <br />j 6 2017 <br />-starting <br />Test Start Time: <br />8:45am <br />ENTAL <br />Initial Reading (RO: <br />5.Opsi <br />- - <br />Test End Time: <br />9:45am <br />Final Reading (RF): <br />5.Opsi <br />Test Duration: <br />1 hr <br />Change in Reading (RF -R,): <br />O.Opsi <br />Pass/Fail Threshold or <br />Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />Test Result: <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments --(include information on repairs made prior to testing, and recommended follow-upforfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.