My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2017 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO 2017 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2019 11:51:06 AM
Creation date
8/5/2019 9:15:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2017 - 2018
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />7_ ITNDER-DISPENSER CONTAINMENT (UDC1 TESTING <br />Test Method Developed By: ❑ UDC Manufacturer N Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum N Hydrostatic <br />❑ Other (Specify) <br />Test Equipment used: INCON SUMP TESTER Equipment Resolution 0.002" <br />' <br />,. <br />UDC # 1-2 <br />UC # 3-4 UDC ft Vent Box <br />UDC # <br />UDC Manufacturer: <br />Bravo <br />Bravo Bravo <br />UDC Material: <br />Fiberglass <br />Fiberglass Fiberglass <br />UDC Depth: <br />32 <br />32" 32" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12" <br />12" 7" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />NIA <br />NIA NIA <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry Dry <br />Portion of UDC Tested' <br />27 Penetrations <br />2"1 Penetrations 2"1 Penetrations <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?' <br />Elves ❑No NNA <br />Elves ❑No NNA Elves ❑No NNA <br />Elves ❑No ❑NA <br />Turbine shutdown response time <br />NIA <br />NIA NIA <br />Is system programmed for fail - <br />safe shutdown?' <br />❑Yes ❑No NNA <br />E] Yes El No ®NA ❑Yes ❑No NNA <br />Elves❑No ❑NA <br />Was fail-safe verified to be <br />operational?* <br />Elves❑No NNA <br />Elves []No NNA ❑Yes ❑No NNA <br />Elves ❑No ❑NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />10 min <br />10 min 10 min <br />Test Start Time: <br />11:10am <br />9:31am 11:10am <br />Initial Reading Rt): <br />2.2382" <br />4.9397" 4.6351" <br />Test End Time: <br />11:25am <br />9:46am 11:25am <br />Final Reading (RF): <br />2.2387" <br />4.9401" 4.6341" <br />Test Duration: <br />15min <br />15min 15min <br />Change in Reading fRt): <br />+0.0005" <br />+0.0004" -0.0010" <br />Pass/Fail Threshold or Criteria: <br />+l- 0.002" <br />+1- 0.002" +1-0.00211 <br />+1-0.00211 <br />Test Result: <br />N Pass ❑ Fail <br />N Pass ❑ Fail N Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />®Yes []No ❑NA <br />®Yes ❑ No ❑ NA ®Yes ❑ No ❑ NA <br />❑Yes ❑No ❑NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes ❑No ❑NA <br />®Yes ❑No ❑NA I NYes ❑No ❑NA <br />Elves ❑No ❑NA <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-up forfailed tests) <br />ENV - <br />If the entire depth of the UDC is not tested, specify how much was tested. If the answer to aU of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested, (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.