Laserfiche WebLink
Mr. Lynn Forcum 10 -2 - 0 28 April 2004 <br /> The approval for the 29.7 acre land application area and increased wastewater flow rates was delayed <br /> while staff and your consultants negotiated the installation of additional wells at the new land area. The <br /> wells were installed on 19 April 2004. This approval to increase flow rates does not relieve CNP of the <br /> requirement to complete the Hydrogeologic Evaluation of Groundwater Conditions (HEGC) report <br /> required in the 7 April 2004 Regional Board correspondence. That report shall provide a technical basis <br /> for the well that will be installed to characterize upgradient groundwater quality at the 10.1 acre land <br /> application area. <br /> If you have any questions, please contact Timothy O'Brien at (916) 464-4616 or Wendy Wyels at <br /> (916) 464-4835. Please note the Regional Board's new address listed at the top of this correspondence. <br /> r, KP��p <br /> THOMAS R. PINKOS <br /> Executive Officer <br /> cc: Mike Huggins, San Joaquin County Environmental Health Department, Stockton <br /> Mike Anderson, Nolte Associates, Sacramento <br /> W:�MO WM=lmquinPl Nuc%NUMF —SAWWel.W <br />