My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
INSTALL 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 9:08:41 PM
Creation date
8/8/2019 4:35:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step Five 1 <br /> o G Place the nut on the inside of the ri;l ith the angled side facing the <br /> \ o riser and the recessed end facing up <br /> .gine upthe holes onthe nutwhh <br /> o the two holes previously drilled in the riser. Insert the two stainless <br /> o steel bolts from the outside of the riser,through the riser and through <br /> the plastic nut.Then,tighten the stainless steel nuts onto the bolts(5 <br /> inch pounds torque). Note:Do not sink the heads of the screws more <br /> than 1/32" into the plastic. Repeat Steps Three to Five with the <br /> remaining nuts. <br /> Step Six <br /> Place the O-ring over the top of the riser as shown. <br /> Step Seven <br /> Drill through the lid in the center of each dimple with a 3/8" drill bit. <br /> Then, place the lid on top of the riser and O-ring, aligning the 3/8" <br /> holes over the plastic nuts installed on the riser. <br /> O <br /> Step Eight <br /> T Place the flat gasket over the threaded stud on the knob and then <br /> I thread the knob down through the lid into the nut. Repeat this step <br /> �— with all remaining knobs. Torque the knobs to 10 inch pounds. <br /> Step Nine <br /> For added protection, run a bead of Bostik FS1100 between the <br /> sump and riser after installation. <br /> E <br /> 0 0 <br /> TOTAL <br /> CONTAINMENT <br /> FAX 215-524-7530 REV1192 <br /> 306 COMMERCE DRIVE • EXTON, PA 19341 • 215-524-9274 • <br />
The URL can be used to link to this page
Your browser does not support the video tag.