My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1996
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
INSTALL 1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2019 9:08:41 PM
Creation date
8/8/2019 4:35:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1996
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sump/Riser Insta ion Instructions 1 Effective Date: NEW 92 <br /> Supersedes: NEW <br /> for Single Access Lids <br /> Assembly Hardware Installation Tools Required <br /> 27"and 33"Rise rs Drill <br /> 42I <br /> Base to Riser Kit Base to Riser Kit Standard Socket Set <br /> 1-1/4"x 1/4"Bolts Standard Wrench Set <br /> (32)2" x 1/4" Bolts (16) 9/64" Drill Bit included in kit) <br /> -(32) 1/4" Hex Nuts (16) 1/4" Nuts <br /> (32) 1/4" Fender Washers (32) 1/4" Standard Washers 3/8" Drill Bit <br /> (32) 1/4" Standard Washers (1)40 Durometer Rubber O-ring Screwdriver <br /> (1)40 Durometer Rubber O-ring (1) 12 x 12, 120 Grit Sandpaper <br /> Riser to Lid Kit Riser to Lid Kit <br /> (16) 6/32 x 7/6" Stainless Steel Bolts (8) 6/32 x 7/8" Stainless Steel Bolts <br /> (16) 6/32 Stainless Steel Nuts (8) 6/32 Stainless Steel Nuts <br /> (8) Plastic Nuts (4) Plastic Nuts <br /> (8) Plastic Knobs (4) Plastic Knobs <br /> (8) Flat Gaskets (4) Flat Gaskets <br /> (1) Closed Cell Foam O-ring (1) Closed Cell Foam O-ring <br /> Step One <br /> Place the Sump/Riser O-ring around the top of the sump base as <br /> shown.Then,place the riser onto the sump base keeping the O-ring <br /> am in place. <br /> o O o <br /> Step Two <br /> 14 5 io 2 12 9 t6 Insert the bolts through the aligned holes drilled in the base and the <br /> 4 riser with washers on both sides of the sump flange, then hand <br /> tighten the nuts. Then, tighten the bolts to 72 inch pounds torque <br /> t I i 9 6 13 incrementally in a pattern that exerts even pressure until a seal is <br /> obtained. Note: On 42"risers, the fender washers go on top of the <br /> flange and standard washers go underneath the flange. <br /> Step Three <br /> \ Take the plastic lid mounting nut and find the groove in the back(flat <br /> side). Next, locate the raised vertical line on the riser(as shown)and <br /> use the groove to find the proper location for the lid mounting nut. <br /> a <br /> a <br /> i <br /> Step Four <br /> Use a 9/64"drill bit to drill pilot holes in the sump using the plastic nut <br /> as a drill template. (Be careful to maintain alignment of the nut while <br /> drilling.)Note:After drilling the firstho/e,temporarilyputa bolt in place <br /> to maintain alignment for the second hole. <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.