My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2900 - Site Mitigation Program
>
PR0519189
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2019 2:38:17 PM
Creation date
8/21/2019 1:52:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0519189
PE
2950
FACILITY_ID
FA0014347
FACILITY_NAME
CURRENTLY VACANT
STREET_NUMBER
6425
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741031
CURRENT_STATUS
02
SITE_LOCATION
6425 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III <br /> 6425 Pacific Ave Page 4 <br /> 1989 <br /> 02-16-89 Permits issued for off site drilling in City and County easements. Permits to drill in the <br /> Payless parking lot were not issued pending receipt of a letter of authorization from the <br /> property owner. <br /> 03-13-89 Site placed into the:Local Oversight Program. Groundwater contamination evidence. <br /> 03-15-89 WEGE correspondence to San Joaquin County Air Pollution Control District regarding an ' <br /> Authority to Construct a groundwater treatment system since floating product detected in <br /> MW3. <br /> WEGE correspondence to the City of Stockton Municipal Utilities Department to discharge <br /> treated groundwater to the sanitary sewer. <br /> 04-12-89 WEGE first sampled MW4, MWS, MW6, MW7, MW8, MW9, and MW10. <br /> 06-14-89 PHS/EHD correspondence notifying water purveyors of the groundwater contamination noted <br /> in MW3. <br /> 08-09-89 NOR/Site letter mailed to Wickland Oil. <br /> 10-10-89 Installation and operation of temporary submersible pumps in MWI and MW3 for product <br /> L recovery. Approximately 40 gallons of gasoline were recovered. <br /> 1990 <br /> 04-25-90 CVRWQCB correspondence indicating that review of the February 1990 Update Status <br /> Report was complete and that the CVRWQCB concurred that the results of the <br /> investigations and aquifer testing should be adequate to design a groundwater extraction <br /> system. <br /> 06-08-90 PHS/EHD correspondence additionally requesting fecal coliform sampling. The remediation f <br /> plan should be submitted by August 20, 1990 <br /> 09-11-90 Wickland correspondence to the State Water Resources Control Board (SWRCB)petitioning <br /> oversight cost review. <br /> 09-12-90 PHS/EHD enforcement correspondence requesting the submittal of a Final Remedial Plan <br /> within 14 days (September 26, 1990). <br /> f <br /> 10-02-90 PHS/EHD enforcement correspondence scheduling an office hearing for October 29, 1990. <br /> 10-30-90 Wickland correspondence to PHS/EHD petitioning for review of local agency costs. <br /> 12-19-90 PHS/EHD Notice of Findings to be published as a legal notice in the Stockton Record on <br /> December 30, 1990.' <br /> PHS/EHD correspondence to Wickland indicating the public review period would commence <br /> on December 20, 1990 and end on January 23, 1991. <br /> PHS/EHD correspondence indicated that the preparation of the local agency record was <br /> completed and that a copy was being directed to the SWRCB. <br /> l <br />
The URL can be used to link to this page
Your browser does not support the video tag.