Laserfiche WebLink
TASK I <br /> Obtain City of Stockton and San Joaquin County Encroachment Pernuts and San Joaquin <br /> County Health Well Destruction Pernuts Mark for underground utilities for well <br /> destruction activities <br /> Geologist, travel to and from site and mark site for 2 5 hr 7000 175.00 <br /> under ound utilities <br /> Mileage 120 mi 035 4200 <br /> Geologist obtain well destruction permits from San Joaquin 4 hr 7000 28000 <br /> County Health, San Joaquin County Encroachment& City <br /> of Stockton Encroachment Permit <br /> Project manager develop traffic safety plan and Health and 4 75 30000 <br /> Safety Plan for City of Stockton, San Joaquin County and <br /> SJC permits <br /> *City of Stockton Encroachment Permit 1 12800 12800 <br /> * San Joaquin County Encroachment Permit 1 12800 12800 <br /> * SJC well destruction permit fee 5 6000 30000 <br /> * WEGE 15%carrying charge for permits 1 15% 1 556001 8340 <br /> TOTAL TASK I $1,436.40 <br /> TASK 11 <br /> Pressure grout wells MW4, MWS, MW6, MW7, MW9, MWI 1 and MWI2 Overdrill <br /> pressure grouted well to 3 feet below surface, place grout cap and compact backfill with <br /> clean dirt to subgrade MW5, MWII and MWl2 are located in dirt surface MW4, <br /> MW6 and MW9 are located in asphalt parking area and MW7 is located in San Joaquin <br /> County sidewalk <br /> Pressure grout MWIO, special area - newly installed UST area Cut off conductor and <br /> MW casing 6 inches above present UST backfill grade (presently 4 feet below surface) <br /> Pressure grout well and conductor to backfill grade forming cap over well <br /> Drill out and grout wells MWI, MW2, MW3, MW8, and MW13. Overdrill wells with <br /> 10" hollow stem auger to 67 foot depth Tremie grout drilled out wells to subsurface <br /> Replace surface as existing MWI, MW2, MW3, and MW13 are in asphalt MW8 is in <br /> dirt in a City of Stockton traffic island Western Geo-Engineers revised the original <br /> bid request, dated August 29, 2001, on September 7, 2001. The revised bid also <br /> included the destructions of the remediation system underground laterals. As of <br /> September 13, 2001 only Woodward Drilling and V&W Drilling have provided new <br /> cost estimate for the revised bid request. <br /> Woodward Drilling $23,816.00 <br /> V&W Drilling $23,898.00 <br /> 2 <br />