Laserfiche WebLink
E. UNDERGROUND STORAGE TANK(S): <br />TANK # <br />I # Q 1 <br /># 0 Z <br /># <br /># <br />#� <br />CAPACITY <br />l S 000 <br />( Z 0 0 0 jr <br />SM « 0 f%i 6 C%rt C A S TI <br />25290.1(c)(1) <br />Tank(s) compatible with the substance to be stored. <br />MANUFACTURER <br />MODEL <br />COMPOSITION <br />G2 Y, (Z S <br />Y, L;-71 11 EL S <br />w <br />fC7j <br />23 CCR '■ <br />D <br />PRODUCT _]F(, <br />2631(n) <br />containments stems approved by independent testing organization e.. UL). <br />® <br />23 CCR <br />2631(a) <br />Secondary Containment Provided for Underground Storage Tanks. <br />Check <br />I MANUFACTURER <br />MODEL <br />Boe <br />Code <br />gmtTN r� (3,Er <br />IIA <br />Section <br />VAPOR PIPING <br />SM « 0 f%i 6 C%rt C A S TI <br />25290.1(c)(1) <br />Tank(s) compatible with the substance to be stored. <br />VENT PIPING <br />25290.2 c 1 <br />1 <br />fC7j <br />23 CCR '■ <br />Design and construction of tank(s) and all other components used to construct primary <br />I� <br />2631(n) <br />containments stems approved by independent testing organization e.. UL). <br />® <br />23 CCR <br />2631(a) <br />Secondary Containment Provided for Underground Storage Tanks. <br />® <br />Buoyancy Calculations submitted and signed by a Professional Engineer or Licensed Architect <br />which demonstrates a safety factor greater than 1.25. <br />F. SYTEM PIPING: <br />Primary <br />PIPING <br />I MANUFACTURER <br />MODEL <br />COMPOSITION <br />PRODUCT PIPING <br />gmtTN r� (3,Er <br />IIA <br />—2P <br />VAPOR PIPING <br />SM « 0 f%i 6 C%rt C A S TI <br />I� <br />VENT PIPING <br />SNA I rVj C 0', r <br />1 <br />� <br />Secnndary <br />PIPING <br />MANUFACTURER <br />MODEL <br />COMPOSITION <br />PRODUCT PIPING <br />S t r6F (BIinC A s r <br />2E b -F +a E A <br />— 2 <br />VAPOR PIPING <br />1 <br />VENT PIPING <br />*HSC -Health and Safety Code <br />** 23 CCR- Code of California Regulations <br />